- 71 -
6. Test Running
1. Check that all tubing and wiring have been properly
connected.
2. Check that the gas and liquid side service valves are
fully open.
(1) Prepare remote controller
Remove the battery cover by pulling it according to
the arrow direction.
Insert new batteries making sure that the (+) and
(–) of battery are installed correctly.
Reattach the cover by pushing it back into position.
NOTE:
• Use 2 AAA(1.5volt) batteries. Do not use rechargeable
batteries.
• Remove the batteries from the remote controller if the
system is not going to be used for a long time.
(2) Precautions in test run
■
The initial power supply must provide at least 90%
of the rated voltage.
Otherwise, the air conditioner should not be operat-
ed.
■
For test run, carry out the cooling operation firstly
even during heating season. If heating operation is
carried out firstly, it leads to the trouble of compres-
sor. Then attention must be paid.
■
Carry out the test run more than 5 minutes without
fail. (Test run will be cancelled 18 minutes later
automatically)
■
The forced operation is started by pressing button
for 2 seconds. (Cassette Type)
The test run is started by pressing button for 5 sec-
onds. (Cassette Type)
The test run is started by pressing timer cancel but-
ton five times continuously. (Room type)
■
To cancel the test run, press any button.
(3) Settlement of outdoor unit
■
Anchor the outdoor unit with a bolt and nut(ø10mm)
tightly and horizontally on a concrete or rigid mount.
■
When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming
the influence of wind and earthquake.
■
In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.
(4) Evaluation of the performance
1. Measure the temperature of the intake and discharge
air.
2. Ensure the difference between the intake temperature
and the discharge one is more than 8°C.
3. For reference; the gas side pressure of optimum condi-
tion is as below.(Cooling)
Bolt
Tubing connection
Discharge
temperature
Discharge air
Intake temperature
Thermometer
Discharge
temperature
Discharge air
Intake temperature
R
Thermometer
Содержание A2UN186FA0
Страница 104: ... 104 Electronic Control Device 1 Room Type Indoor Unit MAIN P C B DC ASM MAIN P C B AC ASM ...
Страница 105: ... 105 2 Cassette Type Indoor Unit MAIN P C B DC ASM ...
Страница 106: ... 106 3 Art Cool Type Indoor Unit TOP VIEW BOTTOM VIEW ...
Страница 107: ... 107 4 Convertible Type Indoor Unit ...
Страница 108: ... 108 5 Display ASSY Room Type Indoor Unit Convertible Type Indoor Unit Art Cool Type Indoor Unit TOP VIEW BOTTOM VIEW ...
Страница 109: ... 109 6 SUB P W B ASSEMBLY Art Cool Type Indoor Unit TOP VIEW BOTTOM VIEW ...
Страница 110: ... 110 7 Outdoor Unit MAIN P C B ASM V P U N W ...
Страница 111: ... 111 Schematic Diagram 1 Room Type Indoor Unit ...
Страница 113: ... 113 3 Art Cool Type Indoor Unit ...
Страница 114: ... 114 4 Convertible Type Indoor Unit RY 4WAY RY OUTFAN ...
Страница 120: ... 120 354212 249951 268714 266012 352114 263230 352118 330870 158591 3 Cassette Type Indoor Unit AMNN126EA0 AMNN186TEA0 ...
Страница 121: ... 121 346810 130411 359011 152312 135802 135312 2 W0CZZ 137211 267110 352150 352150 130911 140570 268712 146811 ...
Страница 132: ...P No 3828A20097N August 2003 Printed in Korea ...