Contact Lex Products: 800.643.4460 [email protected]
10
PowerGATE
®
ReadySwitch
™
Appendix C
Represented Models and Wire Range for ReadySwitch
Part Number
Wire Range
PIPM0400-C-C-AJ-GRXEE
#6-500MCM
PIPM0400-C-C-AJ-GOXEE
#6-500MCM
PIPM0400-C-C-AJ-GBXEE
#6-500MCM
PIPM0400-S-S-AJ-GRXFF
#6-500MCM
PIPM0400-S-S-AJ-GOXFF
#6-500MCM
PIPM0400-S-S-AJ-GBXFF
#6-500MCM
Appendix D
Labels for Replacement - Parts List
p/n: – LBL-PGIP-D2
4.00"
2.
75
"
R 0.125
Lex P/N: LBL-PGIP-D2
Revision: NS
Red color to be ANSI Z535.4 ‘Danger’ Red
Materials to be the same or similar to LBL-CS400
DANGER
Do not start the generator until all connectors are connected
or made to be inaccessible. Any terminal may be energized
when any cable is connected. De-energize cables at the
generator prior to connecting or removing any connectors
Ne pas mettre la génératrice en marche avant que tous les
connecteurs soient connectés ou rendus inaccessibles.
N’importe quelle borne peut être mise sous tension si un
câble est raccordé. Débrancher les câbles à la génératrice
avant de brancher ou de débrancher les connecteurs
LB
L-
P
G
IP
-D
2
p/n: – 10519-2-026
Verify the condition of the power source prior to
manually transferring. Manual operation may result in
out-of-phase transfer when both sources are energized.
Vérifiez l'état de la source d'alimentation avant
d'effectuer le transfert manuellement. Un fonctionne-
-ment manuel risquerait de causer un transfert hors
phase lorsque les deux sources sont activées.
WARNING
AVERTISSEMENT
10519-2-026 rev 000
Appendix A
Pre-Operation & Operation Checklist
1. Visual inspection of enclosure
–
Ensure the PowerGATE ReadySwitch is firmly secured to
the building
– Review conduit connection for signs of leakage
– Ensure enclosure is intact with no signs of cracking
2. Open the front door of the PowerGATE ReadySwitch
– Ensure the chamber is dry and free of debris
– Ensure the vermin door is un-obstructed and that cable
can flow freely through cable entry holes
– Ensure that gaskets are pliable and no cracking exists
– Ensure that door hinges are secure and lubricated
– Ensure that hasps are intact and operational
3. Inspect all portable cables
– Do not use cables if they appear frayed
– Do not use cable if connectors or plug do not seat
properly
– Do not use cables if any copper wiring is exposed
4. Lex Products technical services are available to assist in
resolving issues. If you have any questions or need technical
advice or suggestions regarding this product, please contact
Lex Products at 800.643.4460 or e-mail info@LexProducts.
com
Appendix B
Initial Setup Safety Checklist
1. Ensure that all load terminals are securely fastened and that
the set screws are set at 375lb.-in torque each
2. Ensure electrical connections are intact with no signs of
corrosion or cracking
3. Review all safety labels and ensure that they are present and
legible. See Appendix E for label nomenclature and location.
Replace as needed
4. Ensure Phase rotation is correct
– Verify Phase A of MAIN is PHASE A as labeled on the
terminals of the input
– Verify Phase B of MAIN is PHASE A as labeled on the
terminals of the input
– Verify Phase C of MAIN is PHASE A as labeled on the
terminals of the input
– Verify Phase A of BUILDING is PHASE A as labeled on
the terminals of input
– Verify Phase B of BUILDING is PHASE A as labeled on the
terminals of the input
– Verify Phase C of BUILDING is PHASE A as labeled on the
terminals of the input
4.00"
2.
75
"
R 0.125
Lex P/N: LBL-PGIP-W1
Revision: NS
Orange color to be ANSI Z535.4 ‘Warning’ Orange
Materials to be the same or similar to LBL-CS400
Risk of Electric Shock
Plug connection should be in the following order:
1) Equipment grounding conductor connectors,
2) Grounded circuit conductor connectors, and
3) Ungrounded conductor connectors.
Disconnection should be in the reverse order
Risque de choc électrique
Le raccordement devrait être effectué dans l’ordre qui suit:
1) Conducteur de mise à la terre de l’appareillage
2) Conducteur du circuit mis à la terre
3) 3) Conducteurs non mis à la terre
La mise hors tension doit se faire dans l’ordre inverse
WARNING
AVERTISSEMENT
LB
L-
P
G
IP
-W
1
p/n: – LBL-PGIP-W1