
Fig 4.1.1
Fig 4.1.2
Pontoon VRTT Thruster Manual ref 55110293 iss.4
|
7
4.1 Place upper VRTT
Assembly on to the lower flange.
1. Lower thruster through hole in mounting box. Ensure 2 orings are in place. Use grease to temporarily hold
orings in place while lowering thruster. Line bolt clearance holes.
2. Push on securing ring from underneath, ensuring that 3 orings are used and in place. Apply grease to Oring.
3. Secure retaining ring with 6 bolts from above thruster.
4. Replace tunnel assembly. Ensure oring is in place
5. Rotate prop if motor shaft doesnt line up with thruster hub
6. Secure tunnel assembly with 6 x norlock washers and m6 bolts.
4 - Fitting
Содержание 125 VRTT
Страница 1: ...125 VRTT Pontoon Thruster Manual ref 55110293 iss 4 Owner s Installations Operation servicing manual...
Страница 16: ...16 GB 13 1 125 VRTT Specification 13 Dimensions...
Страница 17: ...Pontoon VRTT Thruster Manual ref 55110293 iss 4 17 14 Spare Kits 14 1 125 VRTT Spares...
Страница 18: ...18 GB 14 2 125 VRTT Spares...
Страница 22: ...22 GB WO Assembly Checked Deployment Checked Actuator and Switch Adjustment ICU Test Deploy Retract Test...
Страница 23: ...Pontoon VRTT Thruster Manual ref 55110293 iss 4 23 NOTES...