Lewmar 125 VRTT Скачать руководство пользователя страница 6

REMOVE ALL BURRS AND SHARP EDGES

Unauthorised use, manufacture or reproduction

In whole or in part is prohibited

1

2

A

3

4

5

B

C

D

E

6

7

8

ORIGINAL SIZE A3

10

REFERENCE SCALE IN MM

9

10

0

20

A

30

40

50

B

C

D

E

G

F

H

I

J

1

2

3

4

5

G

F

H

6

7

8

I

J

9

10

FIRST ANGLE PROJECTION

SHEET 1 OF 2

IF IN DOUBT ASK

R327.5

186.0

126.0

THRO'

25.0°

25.0°

90.0°

100.0°

155.0°

155.0°

7.0

THRO'

20.0°

20.0°

300.0

300.0

220.0

213.0

R20.0

PART No.

   

55110251

DATE

MOD'D BY

MOD No.

REVISION

ISSUE

17-Jun-20

AB

18014

FIRST ISSUE

A

PART No.

   

55110251

MODEL NAME: 55110251

FINISH

  TBD

SCALE

     1:4

TOLERANCES (UNLESS STATED)

LINEAR     0.2

ANGULAR   0.5

TITLE

    

PONTOON VRTT MOUNTING BOX

DATE

    17-Jun-20

MATERIAL

  5083

DRN

     AB

ALL DIMENSIONS IN mm

BOAT BOW

BOAT BOW

HULL CUTOUT DIMS

WELD 4 EDGES OF BOX

SCALE  1:5

GB

3.4 Lifting the unit

The Thruster is heavy so when lifting the Thruster unit from its packing case, ensure that adequate lifting strops 

are used. The thruster should not be lifted by its actuator assembly or propeller shroud. Extra caution should be 

used to avoid damaging these parts and the micro switches and control box. When moving the Thruster, ensure 

that the seating surfaces of the main housing are protected against potential damage. 

3.5 Fitting into the hull

The thruster requires a compartment to be constructed within the hull to mount the assembly, with an opening 

in the bottom of the hull for thruster to be deployed and retract through. 
The top of this watertight compartment is to act as the mounting seat for the thruster base plate. This  

watertight compartment must be designed to take the weight of the thruster, the transfer of thrust to the hull 

and any additional forces created while the vessel is in motion. It is recommended that this is carried out by a  

qualified navel architect.

The VRTT Thruster is supplied in the retracted position for ease of transportation. The thruster will need to 

be lowered once located. The tunnel can then be removed to allow the thruster assembly to be posted down 

through the top of the hull. The unit is shipped with only 2 bolts holding the tunnel on.

Securing ring should also be removed from the bottom of the thruster.

Recommended mounting box shown above. Other shaped mounting plates can be used, but must be to the cor-

rect height, and also sealed from below.

Содержание 125 VRTT

Страница 1: ...125 VRTT Pontoon Thruster Manual ref 55110293 iss 4 Owner s Installations Operation servicing manual...

Страница 2: ...distributors and Authorised Service Representatives If you encounter any difficulties with this product please contact your national distributor or your local Lewmar dealer Details are available at w...

Страница 3: ...vironment Electric bow thrusters use powerful electric motors it is very important that there is sufficient battery capacity and large enough cables for safe operation Using smaller than recommended b...

Страница 4: ...r source supplying the Thruster motor Adequate space should be allowed inside the hull for electric cables and access for service etc It is also important that the area around the thruster be kept cle...

Страница 5: ...BD SCALE 1 4 TOLERANCES UNLESS STATED LINEAR 0 2 ANGULAR 0 5 TITLE PONTOON VRTT MOUNTING BOX DATE 17 Jun 20 MATERIAL 5083 DRN AB ALL DIMENSIONS IN mm BOAT BOW BOAT BOW HULL CUTOUT DIMS WELD 4 EDGES OF...

Страница 6: ...e parts and the micro switches and control box When moving the Thruster ensure that the seating surfaces of the main housing are protected against potential damage 3 5 Fitting into the hull The thrust...

Страница 7: ...y hold orings in place while lowering thruster Line bolt clearance holes 2 Push on securing ring from underneath ensuring that 3 orings are used and in place Apply grease to Oring 3 Secure retaining r...

Страница 8: ...t switch position can be adjusted To raise full retracted position adjust the top cone upwards To lower full extended position adjust the bottom cone downwards Above and below each cone is a nut Tight...

Страница 9: ...ise The ICU should be located in the vertical plane as per the arrow on the lid and within 5 meters of the motor It is recommended that the ICU not is attached directly to the motor The ICU requires i...

Страница 10: ...e thruster current Main power cables should be run from the batteries and must have an in line fuse fitted The cables should be terminated with a ring terminal corresponding to the motor studs 8 mm 5...

Страница 11: ...ured between the VE stud and the motor body remove any bonding straps attached to the assembly and check as before Test 2 Fig 7 5 2 With the battery applied Use a voltmeter to test the voltage between...

Страница 12: ...auxiliary wire is used to connect an automatic battery switch Please refer to the units instructions If automatic battery switch not fitted disregard auxiliary wire 7 6 Installing control panel all m...

Страница 13: ...ill stop thrusting The system will automatically power down after 1 minutes of inactivity for VRTT thrusters When changing thrust instantly from PORT to STBD vice versa there will be a short delay to...

Страница 14: ...ved the tunnel gasket must be replaced Inspect motor ensure all leads are still tight Check all bolts and nuts are to correct torque Check the motor assembly is dry and that the compartment is water t...

Страница 15: ...thrust in one direction only Batteries not large enough or charged cables not recommended size Voltage at motor when running should be a minimum 10V Blockage in tunnel propeller jammed with debris sw...

Страница 16: ...16 GB 13 1 125 VRTT Specification 13 Dimensions...

Страница 17: ...Pontoon VRTT Thruster Manual ref 55110293 iss 4 17 14 Spare Kits 14 1 125 VRTT Spares...

Страница 18: ...18 GB 14 2 125 VRTT Spares...

Страница 19: ...9894 125 VRTT GEN 2 ICU 23 1 589808 GEN2 RT MOTOR LOOM 2M 1 589809 GEN2 RT MOTOR LOOM 5M 0 56110037 125 VRTT DRIVE SHAFT KIT 7 1 5 1 8 1 9 4 6 2 56110038 125 VRTT UPPER BUSHING KIT 10 2 11 2 12 1 13 1...

Страница 20: ...om MX 589805 Gen2 AUX 22m Loom MX 10 589006 Fuse Holder 11 589010 T2 Fuse Holder 12 589007 130 A ANLTYPE FUSE 589008 250 A ANLTYPE FUSE 589009 325 A ANLTYPE FUSE 589010 400 A ANLTYPE FUSE 589011 500 A...

Страница 21: ...cations Products used in commercial or charter applications Anchor rodes C LIABILITY i Lewmar s liability under this warranty shall be to the exclusion of all other warranties or liabilities to the ex...

Страница 22: ...22 GB WO Assembly Checked Deployment Checked Actuator and Switch Adjustment ICU Test Deploy Retract Test...

Страница 23: ...Pontoon VRTT Thruster Manual ref 55110293 iss 4 23 NOTES...

Страница 24: ...oor Lane Havant Hampshire PO9 1JJ England T l 44 0 23 9247 1841 Fax 44 0 23 9248 5720 E mail info lewmar com USA Lewmar Taylor Made Products 65 Harrison Street Gloversville New York 12078 USA T l 1 20...

Отзывы: