2 Installation
6
2.2 Install 347V Wye/600V Delta PT module in 600V three-phase 3-wire system
WARNING:
•
HIGH VOLTAGE: RISK OF ELECTROCUTION, SHOCK, EXPLOSION, OR ARC FLASH.
To be installed by electrician or other qualified personnel only.
•
TO AVOID FIRE, SHOCK OR DEATH,
turn off all power supplying equipment before
working on or inside the equipment. Use a properly rated voltage sensing device to confirm
power is off.
•
Follow safe electrical work practices. See NFPA 70E in the USA, or applicable local codes.
1.
Install the configuration jumper on the PT module in the 600V delta position (default), as shown in
Figure 3, and as indicated on the printed circuit board.
2.
Remove the control voltage jumper on the
VerifEye meter as shown in Figure 3.
3.
Connect the source panel
disconnector breaker to the VerifEye
Series 8000 PT module in accordance
with local and national electrical
codes.
4.
Connect the VerifEye Series 8000 PT
module to the VerifEye Series 8000
meter using a 3-wire (red, black, blue),
14 AWG (1.63 mm2), 194°F (90°C)
cable. The maximum cable length
between the 120V outputs of the PT
module and the meter sense voltage
Figure 3: 600V delta PT module to meter wiring connections
C
B
A
N
N
A
B
C
AUX_N
AUX_A
C
B
A
N
Configuration Jumper (600V position)
C
B
A
N
C
B
A
N
C
B
A
N
C
B
A
N
AUX-A
AUX-N
PT Module
Meter
BL
BK
RD
BL
BK
RD
Control Voltage
Jumper Removed
AUX_A AUX_N