1 Introduction

1

This guide provides a description of the VerifEye Series 8000 PT (potential transformer) module and 
procedures for installing and maintaining the module.

This documentation is intended for those responsible for installing and maintaining the VerifEye PT 
(potential transformer) module. Installers must be qualified electricians with knowledge of local and national 
code requirements. See Warnings and Cautions.

1.1 Description and specifications

The VerifEye Series 8000 PT module provides step-down voltage connections to VerifEye Series 8000 
meters for metering single-phase to three-phase voltages of 600V, 347V, or 400V, while meeting all 
regulatory electrical safety and ANSI 0.5 Accuracy Class standards. The VerifEye Series 8000 PT module 
provides both the per-phase input metering sense voltages and the auxiliary input power required by 
VerifEye Series 8000 energy meters.

There are two variants of the VerifEye Series 8000 PT module that support the following source voltages 
and wiring configurations:

1.

 The 347V Wye / 600V Delta variant supports:

 

• 347V, three-phase, 4-wire wye

 

• 600V, three-phase, 3-wire delta

2.

 The 480V Delta variant supports:

 

• 480V, three-phase, 3-wire delta

The 347V/600V PT module variant has three sense voltage potential transformers for metering. The 
configuration of the transformers (347V wye or 600V delta) is selected by using the jumper provided.

The 480V PT module has two sense voltage potential transformers for metering.

There is a separate auxiliary power transformer in both variants to operate the meter. All voltage inputs 
are fused.

One VerifEye Series 8000 PT module can be used to provide sense voltages and auxiliary power to a 
maximum of two meters.

Table 1 lists the specifications of the VerifEye PT module.

WEB 

VERSION

Содержание Verifeye 8000 Series

Страница 1: ...DI DPT S480V 00A VerifEye Series 8000 PT Module Cat No S480V Installation Guide WEB VERSION ...

Страница 2: ... Delta PT module in 600V three phase 3 wire system 7 2 3 Install 347V Wye 600V Delta PT module in 347V three phase 4 wire system 8 2 4 Install 480V Delta PT module in 480V three phase 3 wire system 9 3 Maintenance 9 3 1 Fuse Replacement 9 4 Regulatory Compliance 10 4 1 Equipment servicing and access 10 5 Warranty and Contact Information 11 WEB VERSION ...

Страница 3: ...ssible to authorized personnel only Equipment must be installed in areas where access can be restricted DO NOT work alone Before closing all covers and doors carefully inspect the work area for tools and objects that may have been left inside the equipment DO NOT bypass external fusing DO NOT short the secondary of a Voltage Transformer VT Always short the secondary of a current transformer prior ...

Страница 4: ...e input metering sense voltages and the auxiliary input power required by VerifEye Series 8000 energy meters There are two variants of the VerifEye Series 8000 PT module that support the following source voltages and wiring configurations 1 The 347V Wye 600V Delta variant supports 347V three phase 4 wire wye 600V three phase 3 wire delta 2 The 480V Delta variant supports 480V three phase 3 wire del...

Страница 5: ...e outputs F4 T250 mA 250V F5 F6 F7 Transformer specifications Input voltage 600V Voltage tolerance 10 480V 347V Output voltage 120V Accuracy 0 3 Environmental Operating temperature 40 to158 F 40 to 70 C Operating humidity 5 to 90 non condensing Usage environment Indoor or enclosed outdoor environment Maximum altitude 9843 ft 3000 m Pollution degree 2 Table 1 VerifEye PT module specifications WEB VER...

Страница 6: ...ch installation may vary depending on physical site restrictions Figure 1 shows the recommended spacing for mounting the equipment at the installation site Figure 1 Recommended equipment spacing and dimensions 7 59 in 189 8 mm 9 0 in 228 6 mm MIN 3 50 in 88 9 mm 8 39 in 213 1 mm 13 19 in 335 0 mm 13 53 in 343 7 mm 2 25 in 5 4 mm 6 50 in 16 5mm No 8 SCREWS TYPICAL PT ENCLOSURE METER SHORTING OR TER...

Страница 7: ...e working on or inside the equipment Use a properly rated voltage sensing device to confirm power is off Follow safe electrical work practices See NFPA 70E in the USA or applicable local codes In all installations the VerifEye Series 8000 PT Module must be connected to the source panel voltage through a 15A maximum disconnect or breaker that disconnects all line and neutral wires so that the PT mod...

Страница 8: ...2 Installation 5 Generic Breaker Panel PT Module Shorting Block Module Generic Conduit Figure 2 Typical three phase 4 wire 347V wye system installation WEB VERSION ...

Страница 9: ... shown in Figure 3 and as indicated on the printed circuit board 2 Remove the control voltage jumper on the VerifEye meter as shown in Figure 3 3 Connect the source panel disconnector breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 4 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 3 wire red black blue 14 AWG...

Страница 10: ... indicated on the printed circuit board 2 Remove the control voltage jumper on the VerifEye Series 8000 meter as shown in Figure 4 3 Connect the source panel disconnect or breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 4 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 4 wire red black blue white 14 AWG 1 63 ...

Страница 11: ... disconnect or breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 2 Remove the control voltage jumper on the VerifEye Series 8000 meter as shown in Figure 5 3 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 3 wire red black blue 14 AWG 1 63 mm2 194 F 90 C cable as shown in Figure 5 The maximum cable length betwe...

Страница 12: ...OID FIRE SHOCK OR DEATH turn off all power supplying equipment before working on or inside the equipment Use a properly rated voltage sensing device to confirm power is off Follow safe electrical work practices See NFPA 70E in the USA or applicable local codes Replace all devices doors and covers before turning on power to this equipment 1 Remove the outer cover from the unit 2 Locate the fuse to b...

Страница 13: ...any of the equipment Visually inspect the equipment yearly and ensure it is free of dust or other particles If necessary wipe with a clean cloth Component servicing Individual components are not user serviceable and must be returned to Leviton for repair If an equipment fault occurs do not attempt to repair the faulty component All maintenance activities should be performed by qualified personnel o...

Страница 14: ...sed opened abused or altered in any manner or is not used under normal operating conditions or not in accordance with any labels or instructions There are no other or implied warranties of any kind including merchantability and fitness for a particular purpose but if any implied warranty is required by the applicable jurisdiction the duration of any such implied warranty including merchantability a...

Отзывы: