User Manual
Publication date: May, 2005
Revision A1
9
2. Installation
2-1. Starting GSW-2494 Up
This section will give users a quick start for:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
⇒
Wear a grounding device to avoid the damage from electrostatic discharge
⇒
Be sure that power switch is OFF before you insert the power cord to power
source
•
Installing Optional SFP
Fiber Transceivers to GSW-2494
Note: If you have no modules, please skip this section.
•
Connecting the SFP Module to the Chassis:
The optional SFP modules are hot swappable, so you can plug or unplug it
before or after powering on.
1. Verify that the SFP module is the right model and conforms to the chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fig. 2-1 Installation of Optional SFP Fiber Transceiver
Содержание GSW-2494
Страница 1: ...LevelOne GSW 2494 L2 Managed Switch User s Manual User s Manual Ver 1 00 0507...
Страница 29: ...User Manual Publication date May 2005 Revision A1 25 Fig 2 13 Office Network Connection...
Страница 137: ...User Manual Publication date May 2005 Revision A1 133 Upload Log Upload log data through tftp Clear Log Clear log data...
Страница 142: ...User Manual Publication date May 2005 Revision A1 138 Fig 4 1 Fig 4 2...
Страница 227: ......