7
Chapter 2
Installation and Set-up of GNS-8000A
2.1 Installing the Hardware
The following steps will guide you through the GNS-8000A hardware installation:
1. Connect the GNS-8000A to your Network.
Note:
The system provides two network ports. To configure Fail Over
and Load Balance, at least two network ports must be connected.
2. If you want to back up your files to the tape, please connect the tape drive to
the SCSI port on the back of your GNS-8000A. Then turn on the tape drive.
3. To use a UPS with your unit, please connect the UPS to the RS-232 port on
the back of your GNS-8000A via a serial cable. And connect the power plug
of the GNS-8000A to the output power inlet of the UPS.
4. Power on the GNS-8000A.
Note:
The power switch uses toggle switch design (after pushing the button
it will return to the original position). All you need to do is to flip the switch
one to turn-on or turn-off.
Содержание GNS-8000A
Страница 1: ...Fa LevelOne GNS 8000A 4 bay NAS w 2 Gigabit Ethernet User s Manual...
Страница 12: ...11 3 2 Server Administration...
Страница 44: ...43 1 2 3...
Страница 78: ...77 Backup Select files or folders to be backed up...
Страница 80: ...79 C Monitor Select folder s or file s to be monitored and then click Monitor...
Страница 81: ...80 Restore A Select Restore to original position or click to specify the directory for restoring...
Страница 83: ...82 Event A Click Option to select type of logs to be recorded B To clear all logs click Clear All...