Leuze it 1452g Скачать руководство пользователя страница 6

IT 1452g - 01

2015/09

Connecting the IT 1452g to the MA 2xx

i

 

Required parts:

1x

IT 1452g 1D-2 

1x

50130499

Base for IT 1452 base station

1x 

50115105 

RS 232 cable

1x

50114525

Power supply unit

1x

50113397

KB JST-HS-300

1x Connection unit 

MA 2xx

i

 for the respective fieldbus system:

50112893

MA 204

i

 for PROFIBUS or

50112892

MA 208

i

 for Ethernet or

50112891

MA 248

i

 for PROFINET

Procedure:

1.

Insert the KB JST-HS-300 cable into the MA 2xx

i

.

2.

Connect the interface cable to cable KB JST-HS-300.
Connect the interface cable and the power supply unit to the base station (see "Con-
necting the IT 1452g to the serial PC interface").

3.

Scan the adjacent 2D code. 
The hand-held scanner is set to the following transmission parameters: 
RS 232 transmission with 9600 baud, 8 data bits, 1 stop bit, no parity, postfixes 
<CR><LF>.

4.

Return the hand-held scanner to the base station to apply the settings. This procedure 
is concluded with audible confirmation signals.

IT 1452g

Содержание it 1452g

Страница 1: ...0114521 USB helix cable 5m Part no 50114523 Power supply unit Part no 50114525 UL US C LISTED IP IP 42 42 Dimensioned drawing 62 62 82 82 173 173 Hand held scanner IT 1452g 1D 2 with Bluetooth Bluetoo...

Страница 2: ...ons 173x82x62mm 101x131x81mm Shock resistance 30 falls from a height of 1 5m 50 falls from a height of 1m Environmental data Ambient temp operation 0 C 50 C 0 C 50 C Ambient temp storage 40 C 70 C 40...

Страница 3: ...pulling the trigger A green target line as well as the red illumination should now be visible Now scan a sample label The scanner emits an acoustic signal to confirm that the label has been read if n...

Страница 4: ...COM port emulation only The command is to be sent at the set baud rate parity and data and stop bits The command for activation is SYN T CR ASCII decimal values 022 084 013 To cancel read readiness se...

Страница 5: ...n the computer 3 and to the base station 2 3 Plug one end of the power supply unit cable into the base station 4 and the other end into a free power socket 5 4 Switch the PC back on 5 Scan the adjacen...

Страница 6: ...T Procedure 1 Insert the KB JST HS 300 cable into the MA 2xxi 2 Connect the interface cable to cable KB JST HS 300 Connect the interface cable and the power supply unit to the base station see Con nec...

Страница 7: ...ield PE 21 Procedure 1 Connect cable KB 021 Z to the MA 21 acc to the above pin assignments 2 Connect the interface cable to cable KB 021 Z Connect the interface cable and the power supply unit to the...

Страница 8: ...D 2 1x 50130499 Base for IT 1452 base sta tion 1x 50114525 Power supply unit 1x 50114519 KB PS2 1 IT 1902 Procedure 1 Switch off the PC 2 Disconnect the keyboard 3 Connect the cable for the base stati...

Страница 9: ...he data can therefore be further processed in all standard programs Required parts 1x IT 1452g 1D 2 1x 50130499 Base for IT 1452 base station 1x 50114525 Power supply unit 1x 50114521 KB USB 1 IT190x...

Страница 10: ...D 2 1x 50130499 Base for IT 1452 base station 1x 50114525 Power supply unit 1x 50114521 KB USB 1 IT190x 3m straight or 1x 50114523 KB USB 2 IT190x 5m spiral Procedure 1 Install the USB serial driver c...

Отзывы: