Page 5 of 7
STEP 8
Center the each Leg assembly and then tighten and fully secure all hand-tightened hardware from Steps 3 & 4. Check all
connections before beginning Landing Gear Operation or operating the vehicle.
Always check connections and hardware before operating the tow vehicle.
WARNING:
LANDING GEAR OPERATION
The following instructions are for Landing Gear Nesting, Deployment and Extension Operations.
Starting with the narrower set of Legs
[
A
] located closer to
the vehicle, pull each Landing Gear Leg downward until both
Engagement Tab’s release [Figure 18,19, & 20].
NESTING LEGS FOR TRANSIT- STEP 1
[Figure 20]
[Figure 18]
[Figure 24]
ENGAGEMENT
TAB ENGAGED
ENGAGEMENT
TAB RELEASED
[Figure 19]
ONLY TWO LEGS
SHOWN FOR CLARITY
C
A
A
A
Swing Spring loaded Legs to nested position and
release the Engagement Tab into the notch to secure
[Figure 21 & 22].
Repeat for the wider set of legs farthest from the
vehicle.
NESTING LEGS FOR TRANSIT - STEP 2
A
[Figure 22]
[Figure 21]
ENGAGEMENT
TAB ENGAGED
ONLY TWO LEGS
SHOWN FOR CLARITY