background image

Step 2

 

Insert the fiber cable of the LC connector into the transceiver as shown below in Figure 
2.6

 

Figure 2.6: LC Connector to the Transceiver 

 
To remove the LC connector from the transceiver, please follow the steps shown below: 

Step 1

 

Press the upper side of the LC connector from the transceiver and pull it out to release 
as shown below in Figure 2.7 

 

Figure 2.7: Remove LC Connector 

 
 
 

Step 2

 

Push  down  the  metal  clasp  and  pull  the  transceiver  out  by  the  plastic  part  as  shown 
below in Figure 2.8 

  

 

Figure 2.8: Pull Out from the SFP Slot 

Содержание PG2-1002-10GSFP Series

Страница 1: ...LEONTON PG2 1002 10GSFP Series User Manual...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...equipment D claration FCC Cet quipement a t test et reconnu conforme aux limites de la classe A pour les quipements num riques conform ment la section 15 des R glementations FCC Ces limites sont con u...

Страница 4: ...equired to take adequate measures CE Mark AVERTISSEMENT Ceci est un produit de classe A Dans un environnement domestique ce produit peut tre utilis en pr sence d interf rences radio This document is t...

Страница 5: ...ption 3 Physical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 6 Cabling 7 Wiring the Power Inputs 9 Wiring the Fault Alarm Contact 10 Mounting Installation 11 DIN Rail Mountin...

Страница 6: ...ndustrial automation application and harsh environments Key Features Interface Performance All Copper ports support auto MDI MDI X function PG2 1002 10GSFP Embedded 8 10 100 1000Tx with PoE PSE 30W Po...

Страница 7: ...industrial Ethernet switch s hardware specs ports cabling information and wiring installation will be described within this user manual ATTENTION Si la tension CC est fournie par un circuit externe v...

Страница 8: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions 54mm W x 142mm H x 99mm D Figure 2 1 Physical Dimensions...

Страница 9: ...naged Ethernet switch is shown below in Figure 2 2 Figure 2 2 The Front Panel Top View Figure 2 3 below shows the top panel of the PG2 1002 10GSFP series switches that is equipped with one 6 pin remov...

Страница 10: ...nput 1 is inactive P2 Green On Power input 2 is active Off Power input 2 is inactive FAULT Red On Power input 1 or 2 is inactive Off Power input 1 and 2 is active L A LAN Port 1 8 Green On Connected t...

Страница 11: ...raight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45...

Страница 12: ...se employ optional optical transceiver SFP that complies with IEC 60825 1 and classified as Class 1 laser product Attention Veuillez utiliser un metteur r cepteur optique SFP conforme la norme CEI 608...

Страница 13: ...ctor from the transceiver please follow the steps shown below Step 1 Press the upper side of the LC connector from the transceiver and pull it out to release as shown below in Figure 2 7 Figure 2 7 Re...

Страница 14: ...nnector as shown below in Figure 2 9 Figure 2 9 Power Terminal Block Step 2 Tighten the wire clamp screws to prevent the wires from loosening as shown below in Figure 2 10 Figure 2 10 Power Terminal B...

Страница 15: ...application example for the fault alarm contact is shown below in Figure 2 11 Figure 2 11 Wiring the Fault Alarm Contact Caution The wire gauge for the terminal block should range between 12 24 AWG If...

Страница 16: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Страница 17: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Страница 18: ...ttom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Страница 19: ...to the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Powe...

Страница 20: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...

Отзывы: