Commissioning
Project transfer to the operating unit
Project download
5
51
EDBPM-H312 DE/EN/FR 2.0
5.2.2
Project download
Note!
In the »HMI Designer«, you can select whether you want to update the
firmware at the time the project is loaded.
The firmware must always be updated with the first download of a
project to the operating unit or after an update of the »HMI Designer«
planning tool.
X
Tip!
Sample projects for the operating unit can be found in the
»HMI Designer« planning tool under
File
Open...
Samples
.
What to do
A
Switch on the PC and start the »HMI
Designer« planning tool.
B
Keep the enter key
of the operating unit
pressed.
F1
F2
F3
shift
Enter
Help
Esc
F4
0
Switch on the supply voltage for the
operating unit.
F1
F2
F3
shift
Enter
Help
Esc
F4
0
Let go of the enter key
when ”H312
Service Page” appears on the display.
F1
F2
F3
shift
Enter
Help
Esc
F4
0
C
Transfer the desired project from the »HMI
Designer« into the operating unit.
F1
F2
F3
shift
Enter
Help
Esc
F4
0
E
HMI Designer - Getting started”
F1
F2
F3
shift
Enter
Help
Esc
F4
0
D
After download is completed, the operating unit is ready for operation and can exchange data
with the connected nodes by the system bus. The project is stored after disconnection from the
supply voltage.
5.2.3
Disconnecting from the PC
1. Switch off PC.
2. Switch off supply voltage for operating unit.
3. Remove programming adapter EPZ-H111 on the operating unit and the
download cable EPZ-H110 from PC.
4. Switch on supply voltage for operating unit.
The operating unit is ready for operation.
Содержание EPM-H312
Страница 2: ......
Страница 33: ...Anhang Stichwortverzeichnis 9 33 EDBPM H312 DE EN FR 2 0 ...
Страница 37: ...Contents i 37 EDBPM H312 DE EN FR 2 0 8 Maintenance 58 9 Appendix 59 9 1 Chemical resistance 59 9 2 Index 61 ...
Страница 63: ...Appendix Index 9 63 EDBPM H312 DE EN FR 2 0 ...
Страница 93: ...Annexe Index 9 93 EDBPM H312 DE EN FR 2 0 ...