Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
5
50
EDBPM-H312 DE/EN/FR 2.0
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
Stop!
Only connect PC and operating unit when the units are switched off!
l
HMI Designer
LCD ADJ
+24 VDC
INPUT: 18 - 32 V 5W
FUSE
315 mA
0 VDC
N.C.
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
1 2 3 4 5
2
3
4
0
1
2
h312_010
Fig.5-1
Connecting operating unit and PC
ƒ
Plug programming adapter EPZ-H111
onto interface ASP8 at operating unit.
ƒ
Connect download cable EPZ-H110
to programming adapter EPZ-H111
.
ƒ
Plug download cable EPZ-H110
onto COM1 or COMx
at PC.
Содержание EPM-H312
Страница 2: ......
Страница 33: ...Anhang Stichwortverzeichnis 9 33 EDBPM H312 DE EN FR 2 0 ...
Страница 37: ...Contents i 37 EDBPM H312 DE EN FR 2 0 8 Maintenance 58 9 Appendix 59 9 1 Chemical resistance 59 9 2 Index 61 ...
Страница 63: ...Appendix Index 9 63 EDBPM H312 DE EN FR 2 0 ...
Страница 93: ...Annexe Index 9 93 EDBPM H312 DE EN FR 2 0 ...