Figure 85. Hot-swap drive installation
a. Ensure that the drive tray handle is in the open position. Slide the drive into the drive bay until it
snaps into position.
b. Close the drive tray handle to lock the drive in place.
Step 4. Check the drive status LED to verify that the drive is operating correctly.
a. If the yellow drive status LED is lit continuously, that drive is faulty and must be replaced.
b. If the green drive activity LED is flashing, the drive is being accessed.
Step 5. Continue to install additional hot-swap drives if necessary.
198
ThinkSystem SR665 Setup Guide
Содержание ThinkSystem SR665
Страница 1: ...ThinkSystem SR665 Setup Guide Machine Types 7D2V and 7D2W ...
Страница 20: ...16 ThinkSystem SR665 Setup Guide ...
Страница 64: ...60 ThinkSystem SR665 Setup Guide ...
Страница 80: ...Figure 24 Cable routing for configuration 4 76 ThinkSystem SR665 Setup Guide ...
Страница 109: ...BP 3 NVMe 2 3 PCIe 3 BP 3 NVMe 4 5 PCIe 7 BP3 NVMe 6 7 PCIe 8 Chapter 3 Internal cable routing 105 ...
Страница 121: ...Figure 39 Cable routing for configuration 1 Chapter 3 Internal cable routing 117 ...
Страница 124: ...Figure 41 Cable routing for configuration 2 120 ThinkSystem SR665 Setup Guide ...
Страница 129: ...Figure 44 Cable routing for configuration 6 Chapter 3 Internal cable routing 125 ...
Страница 131: ...Chapter 3 Internal cable routing 127 ...
Страница 146: ...142 ThinkSystem SR665 Setup Guide ...
Страница 182: ...Connect any cables See Chapter 3 Internal cable routing on page 61 178 ThinkSystem SR665 Setup Guide ...
Страница 220: ...On GPU air baffle 216 ThinkSystem SR665 Setup Guide ...
Страница 240: ...236 ThinkSystem SR665 Setup Guide ...
Страница 248: ...244 ThinkSystem SR665 Setup Guide ...
Страница 253: ... Copyright Lenovo 2020 249 ...
Страница 256: ...252 ThinkSystem SR665 Setup Guide ...
Страница 266: ...262 ThinkSystem SR665 Setup Guide ...
Страница 267: ......
Страница 268: ......