© Copyright Lenovo 2018
Chapter 3: Installing NE2572O Hardware and Options
29
Required Tools
You
need
the
following
tools
or
equipment
to
install
the
NE2572O:
Standard
flat
‐
blade
screwdriver
#2
Phillips
screwdriver
Electrostatic
discharge
wrist
strap
Package Contents
The
basic
NE2572O
package
contains
the
following
items:
One
ThinkSystem
NE2572O
unit
with
rear
‐
to
‐
front
airflow
One
two
‐
post
mounting
kit
for
standard
19”
equipment
racks:
Two
mounting
brackets
Screws
to
attach
brackets
to
the
switch
unit
Screws
to
attach
the
switch
unit
to
the
equipment
rack
One
console
cable
kit
that
includes:
One
RJ45
to
DB9
console
cable
One
Micro
‐
USB
Type
A
to
USB
Type
A
cable
One
power
cord
retention
bracket
One
Important
Notices
document
One
Warranty
Information
document
For
a
list
of
compatible
switch
components
and
options
(such
as
rack
‐
mounting
kits,
modules,
cords,
and
cables),
see
the
Environmental Requirements
This
section
describes
the
basic
environmental
requirements
for
the
NE2572O.
Make
sure
the
location
where
you
install
the
switch
meets
the
following
requirements:
Install
the
switch
unit
in
a
dry,
clean,
well
‐
ventilated
area.
Provide
adequate
space
in
the
front
and
back
of
the
switch
unit,
to
ensure
proper
air
flow.
Make
sure
that
an
adequate
grounded
power
supply
is
within
reach
of
the
switch
unit.
Make
sure
that
twisted
‐
pair
cable
is
routed
away
from
power
lines,
fluorescent
lighting
fixtures
and
other
sources
of
electrical
interference.
Содержание ThinkSystem NE2572O
Страница 1: ...Lenovo ThinkSystem NE2572O RackSwitch Installation Guide For Network Operating System ...
Страница 5: ... Copyright Lenovo 2018 Contents 5 Power Specifications 84 ...
Страница 6: ...6 Lenovo NE2572O Installation Guide ...
Страница 14: ...14 NE2572O Installation Guide ...
Страница 17: ... Copyright Lenovo 2018 17 Chapter 2 Switch Components This chapter describes the NE2572O hardware components ...