20
NE2572O Installation Guide
RJ45 Management Port
The
RJ45
management
port
on
the
front
panel
supports
10/100/1000BASE
‐
T,
in
‐
line
switch
management.
To
attach
an
RJ45
connector
to
the
switch,
push
the
RJ45
cable
connector
into
the
port
connector
until
it
clicks
into
place.
To
disconnect
the
RJ45
cable,
squeeze
the
release
tab
and
gently
pull
the
cable
connector
out
of
the
switch
connector.
RJ45 Management LEDs
The
RJ45
management
port
LEDs
are
oriented
as
shown
in
the
following
figure.
Figure 5.
RJ45
management
port
LEDs
Status
LEDs
for
the
RJ45
management
port
are
described
in
the
following
table.
Reset Button
The
Reset
button
is
recessed
within
a
hole
on
the
front
panel.
Use
a
straightened
paper
clip
or
similar
object
to
press
the
Reset
button.
The
Reset
button
allows
technicians
to
reset
the
switch
as
follows:
Normal
reset—press
and
release
reset
button.
The
switch
will
start
a
forced
reload
procedure
without
saving
the
current
configuration.
This
action
is
intended
for
when
the
switch
is
unresponsive
and
needs
to
be
restarted
to
resume
its
normal
functions.
Table 2.
RJ45 status LEDs behavior
LED
State
Functional Meaning
Link
Flashing
green
Activity
Steady
green
Link
up
Off
No
link
Speed
Steady
green
100/1000
Mbps
connection
Off
10
Mbps
connection
or
no
link
Speed LED
Link LED
Содержание ThinkSystem NE2572O
Страница 1: ...Lenovo ThinkSystem NE2572O RackSwitch Installation Guide For Network Operating System ...
Страница 5: ... Copyright Lenovo 2018 Contents 5 Power Specifications 84 ...
Страница 6: ...6 Lenovo NE2572O Installation Guide ...
Страница 14: ...14 NE2572O Installation Guide ...
Страница 17: ... Copyright Lenovo 2018 17 Chapter 2 Switch Components This chapter describes the NE2572O hardware components ...