50
NE1032 Installation Guide
6.
Gently slide the air-duct unit side flanges into the card guides until the unit is
seated firmly. Make sure that the foam strip is oriented on top.
7.
Secure the air-duct unit to the air-duct brackets with the two M4 thumbscrews.
M4
thumbscrews
Side flanges
Card guides
Foam
Содержание ThinkSystem NE1032
Страница 1: ...Lenovo ThinkSystem NE1032 RackSwitch Installation Guide For Lenovo Cloud Network Operating System ...
Страница 6: ...6 Lenovo NE1032 Installation Guide ...
Страница 14: ...14 NE1032 Installation Guide ...
Страница 18: ...18 NE1032 Installation Guide ...
Страница 19: ... Copyright Lenovo 2018 19 Chapter 2 Switch Components This chapter describes the NE1032 hardware components ...
Страница 30: ...30 NE1032 Installation Guide ...
Страница 86: ...86 NE1032 Installation Guide ...
Страница 92: ...92 NE1032 Installation Guide ...
Страница 112: ...112 NE1032 Installation Guide ...