Step 14. If the blade server is part of a scalable blade complex, assemble the scalable blade complex (see
“Assembling a scalable blade complex” on page 70 for instructions).
Step 15. Install the IBM MAX5 expansion blade if you removed one (see “Installing an IBM MAX5 expansion
blade” on page 88 for instructions).
Step 16. Install the optional expansion unit, if you removed one from the blade server (see “Installing an
expansion unit” on page 97 for instructions).
Step 17. Install the cover onto the blade server (see “Installing the blade server cover” on page 73 for
instructions).
Step 18. Install the blade server or scalable blade complex into the BladeCenter chassis (see “Installing a
blade server in a BladeCenter chassis” on page 67 for instructions).
Removing an I/O expansion card
The following sections describe how to remove the following expansion cards:
• CFFh
• CIOv
For information about removing the SSD expansion card, see “Removing an SSD expansion card” on page
98.
Removing a CFFh expansion card
Use these instructions to remove a CFFh expansion card from the blade server.
To remove a CFFh expansion card, complete the following steps:
Step 1. Before you begin, read “Safety” on page v and “Installation guidelines” on page 65.
Step 2. If the blade server or scalable blade complex is installed in a BladeCenter chassis, remove it. See
“Removing the blade server from the BladeCenter chassis” on page 66 for instructions.
Step 3. Carefully lay the blade server on a flat, static-protective surface.
Step 4. If an optional expansion unit is installed, remove the expansion unit (see “Removing an expansion
unit” on page 96 for instructions).
Note:
Optional expansion units are not supported when a IBM MAX5 expansion blade is installed.
Step 5. If you are removing the CFFh card from a blade server that is the bottom blade server in a scalable
blade complex, disassemble the blade complex (see “Disassembling a scalable blade complex” on
page 68 for instructions).
Step 6. Open the blade server cover (see “Removing the blade server cover” on page 71 for instructions).
Step 7. If an IBM MAX5 expansion blade is installed, remove it (see “Removing an IBM MAX5 expansion
blade” on page 87 for instructions).
Step 8. Locate the CFFh expansion card. The CFFh card is installed in the blade expansion connector (see
“Blade server connectors - BladeCenter HX5” on page 12).
Step 9. Lift the release lever on the CFFh expansion card.
Step 10. Use your fingers to hold the edge of the CFFh expansion card where it connects to the blade
expansion connector; then, lift the card.
Removing and replacing blade server components
119
Содержание BladeCenter HX5 1909
Страница 6: ...iv BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 16: ......
Страница 34: ...18 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 72: ...56 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 292: ...276 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 296: ...280 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 303: ...Taiwan Class A compliance statement Appendix B Notices 287 ...
Страница 304: ...288 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 310: ...294 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Страница 311: ......
Страница 312: ...Part Number 46W8208 Printed in China 1P P N 46W8208 ...
Страница 313: ... 1P46W8208 ...