background image

NOTE: DIAGRAMS & IllUSTRATIONS ARE NOT TO SCAlE.

8

Door Adjustment

The door may need to be adjusted to be com-

pletely airtight. The gasket airtightness can be 

adjusted using the adjustment screw located 

on the fireplace facade at the bottom of the 

fireplace opening.  (An Allen key  # 1/8 will be 

necessary for adjustment).  Turning the screw 

clockwise will increase air tightness.

Glass Care - Replacement

The glass used for the Villa Vista fireplace is a 

high temperature ceramic glass (1,400° F / 760° 

C). If the glass breaks, it must be replaced with 

a ceramic glass. Tempered glass or ordinary 

glass will not withstand the high temperatures 

of the Villa Vista fireplace.  Replacement ceramic 

glass should be purchased from a IHP dealer.  

DO NOT OPERATE THE UNIT WITH CRACKED 

OR BROKEN GLASS

.

Glass Care - Cleaning

The Villa Vista fireplace is designed to keep 

the glass clean under normal operating con-

ditions. If the Villa Vista fireplace is operated 

continuously with the combustion air damper 

closed, the glass will tend to get dirty unless 

the fuel, firebox and glass are maintained at 

hot temperatures (see “Refuelling For Best 

Performance”).  To clean the glass, there are 

a number of specially designed cleaners.  Your 

authorised IHP dealer can recommend a suit-

able cleaner which is available in your area.  

Regular household glass cleaners will not clean 

creosote.  Do not use abrasives such as steel 

pads, steel wool or oven cleaner as they will 

scratch the glass.

Door Installation

The door must be installed only when the instal-

lation of the Villa Vista™ fireplace is completed. 

Fit the male part of the hinge, already fixed on 

the door, in the female part, which is fixed on 

the fireplace (

see 

Figure 8

)

.

To remove the door, simply pull the door up 

from the hinges.

The adjustment of the door has been set at 

the factory.  If the fit is still not perfect, you 

can adjust the door using the hinge screws 

(

see 

Figure 9

)

.

Figure 8

HINGE SCREWS

GASKET ADJUSTEMENT SCREW

DOOR HINGE SCREWS

Figure 9

DO NOT USE CHEMICAL GLASS CLEANERS 

ON PAINTED SURFACES AS IT MAY CAUSE 

THE PAINT TO PEEL.
CAUTION : DO NOT ALLOW WINDOW CLEANER 

TO GET IN CONTACT WITH DOOR GASKET OR 

PAINT ON FACADE OR DOOR.  ONCE CLOSED, 

CONTACT OF GLASS CLEANER WITH THE 

FIREPLACE FACADE CAN PROVOKE PAINT 
PEELING OFF.

Gasket Replacement

Remove the door from the unit and lay it on a 

clean unabrasive surface. To replace the gasket, 

first remove all of the old gasket and gasket 

cement.  Make sure that the surface is totally 

clean before applying new cement or adhesion 

problems may result.  Apply gasket cement to 

the gasket channel and install the new gasket.  

This replacement part is available from your IHP 

dealer in the following dimensions:

FIREPLACE INSTALLATION

Locating the Fireplace
1.

  The best place to install your fireplace is 

determined by considering the location of 

windows, doors, and the traffic flow in the 

room where the fireplace is to be located, 

allowing space in front of the unit for the 

hearth extension and the mantel, and tak-

ing into consideration the location of the 

hot air ducts (optional), outside air kit and 

chimney.  If possible, you should choose 

a location where the chimney will pass 

through the house without cutting floor 

or roof joists (see fireplace dimensions on 

Page 10

)

.

2.

  Usually, no additional floor support is 

needed for the fireplace.  The adequacy of 

the floor can be checked by first estimating 

the weight of the fireplace system.  Weights 

are given on 

Page 25.

 Note the floor con-

struction and consult your local building 

code to determine if additional support is 

needed. 

3.

  A minimum of 7’ (2134 mm) measured from 

the floor to the ceiling is required to install 

the Villa Vista fireplace.  The fireplace can 

be installed on a combustible floor or on a 

base, leaving at least 6’8" (2032 mm) from 

the base of the unit to the ceiling. 

Gasket

Length

Dimensions

Around glass

83"

5/16" dia.

On door 

frame

92"

5/8" dia.

Around ash 

trap

8"

2" wide x 

1/4" thick

Содержание VILLA VISTA 850028M

Страница 1: ...safety gate or barrier screen A French manual is available upon request Order P N 850028CF Ce manuel d installation est disponible en francais simplement en faire la demande Numéro de la pièce 850028CF Wood Burning Fireplaces P N 850028M REV L 05 2013 Villa Vista VILLA VISTA This installation manual will enable you to obtain a safe efficient and dependable installation of your fireplace system Ple...

Страница 2: ...ructionconditions inadequate chimney heights adverse wind conditions and or unusualenvironmentalfactorsor conditions beyond our control WARNING The Villa Vista fireplace must be installed with an outside air kitintake whichisincludedwith the fireplace WARNING THE FIREPLACE MUST BE OPER ATED WITH THE DOORS FULLY OPENEDORDOORSFULLYCLOSED IF THE DOORS ARE LEFT PARTLY OPENED GASANDFLAMEMAYBE DRAWN OUT...

Страница 3: ...on Page 20 Chimney Chase And Multiple Terminations Page 20 Masonry Applications Page 21 Installation Accessories Page 22 Replacement Parts Page 23 Specifications Page 23 Clearance To Combustible Page 23 Chimney Components Lists Page 24 Product Reference Information Page 26 THE FIREPLACE INTRODUCTION The Villa Vista fireplace is an energy efficient heat circulating close combustion fireplace using ...

Страница 4: ... or 6 fires should be small fires of short duration about 30 to 60 minutes This will help cure the refractory bricks Ashes that will accumulate in the ashtray will protect it from intense heat During the first few fires of this appliance there may be some odor and smoke due to the curing of the paint dust ac cumulation and burning off of lubricants used in the manufacturing process It may set off ...

Страница 5: ...ors includingchimney length and the moisture content of the wood This method of burning should be used only after operating the Villa Vista fireplace with the aircontrolopenedtoproduceahotfireforabout an hour Slow combustion can be used at night in order to reduce the heat output and prolong the burn The loading time will be between 6 10 hours Be aware that the glass will get dirty using this sett...

Страница 6: ...e this may cause smoke to be drawn into the room F Do not burn wood in the area in front of the log retainers G Do not abuse the unit by burning paper or cardboard or construction material such as pressed wood plywood or lumber H Do not allow the wood to smoulder or burn withoutflame sincethiswillproduceexces sivecreosoteintheunitaswellasincreased particulate emissions MAINTAINING YOUR FIREPLACE C...

Страница 7: ...c gases Figure 7 5 4 1 2 3 1 Front Refractory 2 Bottom Refractory 3 Left Side Refractory 4 Right Side Refractory 5 Back Refractory Refractory Replacement The intense heat of the fire will normally cause hairline cracks in the refractory These cracks canbeminimizedbypropercuringasdescribed in First Fires They will not normally dimin ish the effectiveness of the refractory If large cracks develop th...

Страница 8: ...the door using the hinge screws see Figure 9 Figure 8 HINGE SCREWS GASKET ADJUSTEMENT SCREW DOOR HINGE SCREWS Figure 9 DO NOT USE CHEMICAL GLASS CLEANERS ON PAINTED SURFACES AS IT MAY CAUSE THE PAINT TO PEEL CAUTION DONOTALLOWWINDOWCLEANER TO GET IN CONTACT WITH DOOR GASKET OR PAINT ON FACADE OR DOOR ONCE CLOSED CONTACT OF GLASS CLEANER WITH THE FIREPLACE FACADE CAN PROVOKE PAINT PEELING OFF Gaske...

Страница 9: ...Vista fireplace may be installed directly on a combustible floor The supplied safety metal strip must be positioned as fol lows One half under the front of the fireplace and the other half must extend on the floor over which the hearth extension will be built see Figure 10A The safety metal strip must cover the entire width of the fireplace The combustible floor in front of the fireplace must be c...

Страница 10: ...e 11 Framing Dimensions Notes Diagrams illustrations and photographs are nottoscale consultinstallationinstructions Product designs materials dimensions specifications colorsandpricesaresubjectto change or discontinuance without notice Allframingdimensionscalculatedfor1 2 dry wallatthefireplaceface Ifsheathingthechase or finishing with other thickness materials calculations will need to be made Th...

Страница 11: ...ion materials must not be in contact with the fireplace or in theenclosureframeasdescribedin Enclosure section NOTE Localcodesmaynotrequirefirestopping at the ceiling levels for outside chase installa tions However it is recommended for safety and the reduction of heat loss WARNING Ifinsulationisused thefireplace must not be placed directly against it Insulation or vapor barriers if used must firs...

Страница 12: ...the unit 38 and a height of 54 from the base of the appliance see Figure 15 3 Non combustible materials such as brick stone or ceramic tile may project in front of and onto the fireplace facing see Figure 14 2 x 3 MIN 54 1 2 GYPSUMBOARD SPACER MANTEL Figure 14 2 x 3 MIN SPACER 1 2 GYPSUMBOARD NON COMBUSTIBLE FACING Figure 15 COMBUSTIBLE CAN NOT PROJECT OVER OR IN FRONT OF THE FIREPLACE 38 54 Mante...

Страница 13: ...imum length See Figure 17 The height of the louver must be measured from the base of the Villa Vista fireplace to the middle point of the louver When installing the double outlet system the hotairoutletscanbeinstalledinthesameroom as the fireplace or one or both of the outlets can be installed in adjacent or upper rooms Installing the ducts at different elevations will tend to exhaust more heat ou...

Страница 14: ...al heating system Malfunction of the heating system s fan will cause the furnace duct to overheat A furnace duct is only single wall and not double wall as is required for the Villa Vista fireplace hot air exhaust 7 Use only IHP grills and components as described in this manual Other grills or registers forexample maybetoorestrictive and may overheat the fireplace or ceiling 8 Do not use insulated...

Страница 15: ... basement or garage 4 The air intake register should be installed where it is not likely to be blocked by snow or exposed to extreme wind and well away fromautomobileexhaustfumes gasmeters and other vents 5 Theductandregistermaybeinstalledabove or below floor level Outside Air Installation Make a 4 1 4 110 mm hole in the outside wall of the house at the chosen location From outside place the outsi...

Страница 16: ...o the chimney for every 2000 feet 600 m above sea level 5 All chimney installations must include at least one support The maxi mum chimney length that can be supported by the fireplace is 20 feet 8m for ACBI chimney and 12 feet 3 7 m for ASHT chimney 6 The chimney must extend at least 3 feet 915 mm above its point of contact with the roof and at least 2 feet 610 mm higher than any wall roof or bui...

Страница 17: ...stallauniversalsupportfasteningthestrapsto thesurroundingjoists ASHT Installsupport as required see Chimney Support Installation Section on Page 20 4 Puttheroofflashinginplaceandsealthejoint between the roof and the flashing with roofing pitch seeFigures25and26 Forslopingroofs place the flashing under the upper shingles and on top of the lower shingles Nail the flashing to the roof using roofing n...

Страница 18: ... 3 8 545mm 19 483mm 21 3 8 545mm CrossSlopeHoleSize Putthechimneycapinto place Washtheroofflashingwithasolvent or vinegar thenpaintitwithrust proof paint Table 2 1 Install the first elbow Turn it in the required direction ACBI To lock it in place turn 1 8 of a turn Fasten the straps attached to the elbow to the surrounding frame using nails or drywall screws ASHT and S2100 Fasten it to the chimney...

Страница 19: ...SHT 15º Deviation 3 5 16 84 mm 4 5 16 110 mm 5 7 8 149 mm 7 7 16 189 mm 10 1 2 268 mm 13 5 8 346 mm 15 3 8 391 mm 16 7 16 418 mm 18 457 mm 19 1 2 495 mm 22 5 8 575 mm Length 15 11 16 398 mm 19 9 16 497 mm 25 3 8 645 mm 31 3 16 792 mm 42 3 4 1086 mm 54 3 8 1381 mm 60 15 16 1548 mm 64 13 16 1646 mm 70 9 16 1792 mm 76 3 8 1940 mm 87 2210 mm 30º Deviation 7 7 16 189 mm 9 7 16 240 mm 12 7 16 316 mm 15 ...

Страница 20: ...pport When installing a support slightly lift the chim neysystemsotheweightwilllieonthesupport notonthefireplacetoreduceexpansionnoises This support has two possible uses 1 For ASHT it must be used on a roof to support the chimney 2 It may be used on a floor ceiling or roof above an offset to support the chimney above the offset 3 It may be used on a floor ceiling or roof above as a supplementary ...

Страница 21: ...he middle of the oval drill a hole in the masonry chimney at 45 or 30 NOTE 45 offsets allowed in Canada only 3 Increase the size of the hole until a 45º or 30º Tubinox liner elbow can be easily slipped through 4 Slide the liner down from the top of the masonry chimney until you reach the hole level 5 Slip through the hole a 45 or 30 liner elbow and connect it to the liner 6 Add a small liner secti...

Страница 22: ...himney for Relining Masonry Chimneys Tubinox chimney or Projet SS 7 diameter with adaptor for installation in a masonry chimney NOTES j Projet Nova Temp HT6000 is equivalent to S2100 k Projet Nova Temp HT6103 is equivalent to ASHT l This appliance is equipped with the ASHT Chimney Adaptor When other chimney is used a chimney adaptor for the chimney will be required m Chimney Adaptor S2100 HT6000 f...

Страница 23: ...r BISZY VRUW VRUW Thermo disk on offblowercontrol forBISZY VTU VTU Blower to flexible pipe adaptor BISAVF BISAVF Backdraft damper BISBD BISBD Fireplace to Flex adaptor and 2 clamps BISAF BISAF CLEARANCE TO COMBUSTIBLES The following clearances meet the minimum requirements for a safe installation Side wall 24 610 mm measured from the doors edge Ceiling 6 8 2032 mm measured from the base of the fir...

Страница 24: ...rts Support Section 10 long ACBI7SL H3263 Universal Support AC10SU H3265 Roof Flashings 1 12 7 12 5 30 Adjustable ACBI7FAR H3276 8 12 12 12 30 45 Adjustable ACBI7FBR H3277 Flat Roof Flashing includes spacer and collar ACBI7FR H3275 Misc Description Cat Part No Firestop ACBI7BF H3268 Radiation Shield ACBI7RS H3269 Attic Radiation Shield ACBI7RSA H3270 Telescopic Attic Radiation Shield ACBI7RST H327...

Страница 25: ...lbow 30 7LE30 7LE30 Elbow 45 7LE45 7LE45 Elbow 90 7LE90 7LE90 Rain Termination Cap regular 7LCS 7LCS Rain Termination Cap deluxe 7LCC 7LCC Supports Top Support 7LST 7LST Support Assembly 7LSA 7LSA Interior Support 7LSB 7LSB Adaptor Flexible Pipe male 7LAAM 7LAAM Adaptor Flexible Pipe female 7LAAF 7LAAF Stainless Steel Flex 5 Ft Long 7LLFLEX 7LLFLEX Adjustable Insulated Wall Radiation Shield 6 to 1...

Страница 26: ...s list Use only parts sup plied from the manufacturer Normally all parts should be ordered through your IHP distributor or dealer Parts will be shipped at prevailing prices at time of order When ordering repair parts always give the following information 1 The model number of the appliance 2 The serial number of the appliance 3 The part number 4 The description of the part 5 The quantity required ...

Отзывы: