29
Unit: mm(in.)
Fig. 37
(3) There must be three fixing point for both horizontal and vertical installation of the
Y-type manifold. See Fig. 38.
Fixing point 1: 100mm(4in) on the main inlet manifold from the welding point
Fixing point 2: 200mm(7-7/8in.) on the main branched pipe from the welding point
Fixing point 3: 250mm(9-5/6in.) on the branched pipe from the welding point
Unit: mm(in.)
Fig. 38
(4) Suspend the header to the ceiling ,and be sure to install the T-type manifold so that
the outlet pipes are horizontal at the lower side. See Fig. 39.
Lennox
VRF Unit
Содержание VEP Series
Страница 42: ...39 Fig 47 Fig 48 Fig 49 Lennox VRF Unit...