PLUMBING

Field refrigerant piping consists of liquid and suction
lines from the condensing unit (sweat connections) to
the indoor evaporator coil (flare or sweat connections).
Use Lennox L10 (flare) or L15 (sweat, non-flare) series
line sets as shown in table 1 or use field-fabricated re-
frigerant lines. Refer to unit information manual piping
section for proper size, type and application of field--
fabricated lines.

Sweat Connection Procedure

1-- Ends of refrigerant lines must be cut square, free

from nicks or dents, deburred. Pipe must remain
round, do not pinch end of line.

2-- Wrap a wet cloth around the liquid line valve body

and copper tube stub to protect from heat damage
during brazing. Wrap another wet cloth underneath
the liquid valve to protect the base paint.

3-- Quench the joints with a wet cloth to prevent possible

heat damage to the valve core and opening port.

4-- A field provided filter drier should be installed as

close as possible to the expansion device.

REFRIGERANT METERING DEVICE

10ACB units are applicable to either RFCIV or an expan-
sion valve system. See indoor coil installation instruc-
tions and the Lennox engineering handbook for ap-
proved RFC and TXV match-ups and application
information. Table 1 lists 10ACB unit liquid and suction
line sizes and corresponding line sets.

TABLE 1

REFRIGERANT LINE KITS

UNIT

LIQUID

LINE

SUCTION

LINE

L10

LINE SETS

10ACB24

10ACB30

10ACB42

3/8 in

(10 mm)

3/4 in.

(19 mm)

L10--41

20 ft. -- 50 ft.

(6 m -- 15 m)

10ACB18 5/16 in*

(8 mm)

3/8 in

(10 mm)

L10--65

30 ft. -- 50 ft.

(9 m -- 15 m)

L10--21

20 ft. -- 50 ft.

(6 m -- 15 m)

5/8 in

(16 mm)

7/8 in.

(22 mm)

10ACB48

3/8 in

(10 mm)

1--1/8 in.

(29 mm)

FIELD

FABRICATED

10ACB60

*Use reducer supplied in bag assembly.

L15

LINE SETS

L15--41

20 ft. -- 50 ft.

(6 m -- 15 m)

L15--65

30 ft. -- 50 ft.

(9 m -- 15 m)

L15--21

20 ft. -- 50 ft.

(6 m -- 15 m)

FIELD

FABRICATED

10ACB36

10ACB62

NOTE -- Line length should be no greater than 50 feet
(15.2 m). Select line set diameters from table 1 to en-
sure oil return to compressor.

RFC Systems

10ACB units are shipped with an RFCIV metering de-
vice. Replace existing RFCIV in indoor unit with RFCIV
supplied with the outdoor unit. Place the supplied
RFCIV sticker on indoor cabinet after installation. See
table 2 for size of RFCIV bullet shipped in each 10ACB
unit. In cases of non-traditional applications, RFCIV
bullet shipped may not be appropriate. Refer to the in-
door coil installation instructions and the engineering
handbook for specific orifice information.

7$%/( 

5)&,9 '5,// 6,=(6

10ACB UNIT

RFCIV PART #

RFCIV DRILL SIZE

10ACB12

42J35

0.047

10ACB18

42J39

0.055

10ACB24

66J87

0.062

10ACB30

42J45

0.067

10ACB36

42J48

0.073

10ACB42

42J52

0.080

10ACB48

42J54

0.084

10ACB60

42J58

0.092

RFCIV bullet is installed as shown in figure 3. Take care
not to twist cap tubes when loosening seal nut from
orifice body.

RFCIV INSTALLATION

DISTRIBUTOR

“BULLET”

ORIFICE

ORIFICE

BODY

SEAL

NUT

FIGURE 3

SWEAT

CONNECTION

All manuals and user guides at all-guides.com

Содержание Value 10ACB Series

Страница 1: ...LHV RQGHQVLQJ 8QLWV 21 16 1 81 76 1 1 2 through 5 ton 503 800M 2 98 Supersedes 503 755M TABLE OF CONTENTS VALUE 10 CONDENSING UNIT 1 SHIPPING AND PACKING LIST 1 GENERAL INFORMATION 1 10ACB UNIT DIMENS...

Страница 2: ...COIL FAN COMPRESSOR INLET AIR INLET AIR SUCTION LINE CONNECTION B 24 1 4 616 3 4 19 2 3 4 70 24 1 4 616 ELECTRICAL INLETS LIQUID LINE CONNECTION Model No A B 10ACB12 10ACB18 in 25 24 1 4 10ACB18 10AC...

Страница 3: ...on diagrams and refer to unit rating plate for minimum circuit ampacity and maximum overcurrent protection size WARNING Unit must be grounded in accordance with nation al and local codes Electric Shoc...

Страница 4: ...SUCTION LINE L10 LINE SETS 10ACB24 10ACB30 10ACB42 3 8 in 10 mm 3 4 in 19 mm L10 41 20 ft 50 ft 6 m 15 m 10ACB18 5 16 in 8 mm 3 8 in 10 mm L10 65 30 ft 50 ft 9 m 15 m L10 21 20 ft 50 ft 6 m 15 m 5 8 i...

Страница 5: ...he primary leak seal To Access Schrader Port 1 Remove service port cap with an adjustable wrench 2 Connect gauge to the service port 3 When testing is completed replace service port cap Tighten finger...

Страница 6: ...TEM USE ADJUSTABLE WRENCH ROTATE STEM CLOCKWISE 90E TO CLOSE ROTATE STEM COUNTER CLOCKWISE 90E TO OPEN BALL SHOWN OPEN TO OUTDOOR COIL TO INDOOR COIL 7 67 1 After the line set has been connected to th...

Страница 7: ...urs the leak testing procedure must be repeated NOTE The term absolute pressure means the to tal actual pressure within a given volume or sys tem above the absolute zero of pressure Absolute pressure...

Страница 8: ...t 6 1m line set 3 8 in 10mm 5 16 in 8mm 2 ounce per 5 ft 57ml per 1 5m 3 ounce per 5 ft 85ml per 1 5m If line length is greater than 20 ft 6 1m add this amount If line length is less than 20 ft 6 1m s...

Страница 9: ...e sys tem Used prudently table 4 could serve as a useful service guide Before charging the unit follow the procedure below to determine the liquid line temperature and the out door ambient temperature...

Страница 10: ...Liquid Line EF EC Out door Ambient EF EC Approach Temperature The resulting difference Approach temperature should agree with the values given in table 6 If not add refrig erant to lower the approach...

Страница 11: ...nd coils for evi dence of oil leaks 3 Check wiring for loose connections 4 Check for correct voltage at unit unit operating 5 Check condenser fan motor amp draw Unit nameplate _________ Actual _______...

Страница 12: ...H 6WDWH 6WDWH 6HUYLFH WHFKQLFLDQ PSV 6XSSO RQGHQVHU DQ RPSUHVVRU QGRRU LOWHU OHDQ QGRRU ORZHU 0 6XSSO 9ROWDJH 8QLW 2II 6 3 URS 2YHU YDSRUDWRU U RQGHQVHU QWHULQJ LU 7HPSHUDWXUH LVFKDUJH 3UHVVXUH 6XFWLR...

Отзывы: