Test operation
105
11.
Test operation
11.1
The test operation must be carried out after the entire installation has been
completed.
11.2
Please confirm the following points before the test operation.
➢
The indoor unit and outdoor unit are installed properly.
➢
Tubing and wiring are correctly completed.
➢
The refrigerant pipe system is leakage-checked.
➢
The drainage is unimpeded.
➢
The ground wiring is connected correctly.
➢
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
➢
The power voltage fits the rated voltage of the air conditioner.
➢
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
➢
The gas-side and liquid-side stop values are both opened.
➢
The air conditioner is pre-heated by turning on the power.
11.3
Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
➢
Whether the switch on the remote controller works well.
➢
Whether the buttons on the remote controller works well.
➢
Whether the air flow louver moves normally.
➢
Whether the room temperature is adjusted well.
➢
Whether the indicator lights normally.
➢
Whether the temporary buttons works well.
➢
Whether the drainage is normal.
➢
Whether there is vibration or abnormal noise during operation.
Outdoor unit
➢
Whether there is vibration or abnormal noise during operation.
➢
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
➢
Whether any of the refrigerant is leaked.
Содержание LICH4012021T431E-1
Страница 12: ...Service Space Indoor Units 10 3 Service Space 1000mm 1000mm 1000mm 1000m m Chart 3...
Страница 13: ...Wiring Diagrams Indoor Units 11 4 Wiring Diagrams...
Страница 15: ...Air Velocity Distributions Reference Data Indoor Units 13 36K Cooling Heating...
Страница 16: ...Air Velocity Distributions Reference Data Indoor Units 14 48 60K Cooling Heating...
Страница 21: ...Field Wiring Indoor Units 19 10 Field Wiring...
Страница 27: ...Service Space Indoor Units 25 3 Service Space Ensure enough space required for installation and maintenance...
Страница 28: ...Wiring Diagrams Indoor Units 26 4 Wiring Diagrams 12k 18k 60k...
Страница 39: ...Field Wiring Indoor Units 37 10 Field Wiring 12K 18K 60K...
Страница 43: ...Ceiling Floor Type Indoor Units 41 3 Service Space...
Страница 48: ...Ceiling Floor Type Indoor Units 46 Floor installation Discharge angle 17 Discharge angle 50...
Страница 49: ...Ceiling Floor Type Indoor Units 47 Model 36k Ceiling installation Discharge angle 17 Discharge angle 50...
Страница 50: ...Ceiling Floor Type Indoor Units 48 Floor installation Discharge angle 17 Discharge angle 50...
Страница 51: ...Ceiling Floor Type Indoor Units 49 Model 48k 60k Ceiling installation Discharge angle 17 Discharge angle 50...
Страница 52: ...Ceiling Floor Type Indoor Units 50 Floor installation Discharge angle 17 Discharge angle 50...
Страница 54: ...Field Wiring Indoor Units 52 10 Field Wiring...
Страница 57: ...Features Indoor Units 55...
Страница 59: ...Service Space Indoor Units 57 3 Service Space...
Страница 60: ...Wiring Diagrams Indoor Units 58 4 Wiring Diagrams LICH4012021T431E 1 LICH4018021T431E...
Страница 64: ...Field Wiring Indoor Units 62 10 Field Wiring LICH4012021T431E 1 LICH4018021T431E...
Страница 67: ...Dimensions Outdoor Units 65 Model KBtu h Unit mm W D H W1 A B 48 60 952 415 1333 1045 634 404...
Страница 69: ...Wiring Diagrams Outdoor Units 67 3 Wiring Diagrams LIHP012000T431E...
Страница 70: ...Wiring Diagrams Outdoor Units 68 LIHP018000T431E LIHP024000T431E...
Страница 71: ...Wiring Diagrams Outdoor Units 69 LIHP036000T431E...
Страница 72: ...Wiring Diagrams Outdoor Units 70 LIHP036000M431E...
Страница 73: ...Wiring Diagrams Outdoor Units 71 LIHP048000T431E LIHP048000M431E LIHP060000M431E...
Страница 98: ...Refrigerant pipe installation Installation 96...