FIGURE 1

G32 PARTS ARRANGEMENT

TOP CAP

CABINET

GLASS FIBER GASKET

FRESH AIR

INTAKE FITTING

BURNER BOX

ASSEMBLY

PATCH

PLATE

PATCH PLATE WITH

BARBED FITTING

AND FLAME

ROLL−OUT SWITCH

TWOSTAGE

GAS VALVE AND

MANIFOLD

BURNER

BOX

COVER

FLAME  SIGHT

GLASS

DuralokPlus

TM

HEAT EXCHANGER

ASSEMBLY

CONDENSER COIL

CONTROL TRANSFORMER

CONTROL VOLTAGE

CIRCUIT BREAKER

WARM

HEADER

(COLLECTOR)

BOX

COLD HEADER 

(COLLECTOR)

BOX

TWO−SPEED

COMBUSTION AIR

INDUCER

COMBUSTION

AIR

ORIFICE

BLOWER

ACCESS

DOOR

BURNER

ACCESS

PANEL

FLUE

TRANSITION

LOW HEAT

DIFFERENTIAL

PRESSURE

SWITCH

SUPPLY

AIR

BLOWER

PRIMARY LIMIT

(ALTERNATE STYLES)

FLUE COLLAR

DOOR INTERLOCK SWITCH

SURELIGHT

TM

 TWO−STAGE

INTEGRATED CONTROL BOARD

HIGH HEAT

DIFFERENTIAL

PRESSURE

SWITCH

(−75 only)

Содержание G32 SERIES

Страница 1: ...Information contained in this manual is intended for use by qualified service technicians only All specifications are subject to change Procedures outlined in this manual are presented as a recommenda...

Страница 2: ...s kg 1 package 157 71 186 84 198 90 218 99 Electrical characteristics 120 volts 60 hertz 1 phase all models less than 12 amps OPTIONAL ACCESSORIES Must Be Ordered Extra Concentric Vent Intake Air Roof...

Страница 3: ...c Blower Taps External Static Pressure High Medium High Medium Medium Low Low in w g Pa cfm L s Watts cfm L s Watts cfm L s Watts cfm L s Watts cfm L s Watts 0 0 2400 1135 1255 2185 1030 1070 1940 915...

Страница 4: ...s in mm in mm in mm 15 4 6 2 51 2 51 2 51 20 6 1 2 51 2 51 3 76 25 7 6 2 51 2 51 3 76 30 9 1 2 51 3 51 3 76 40 12 2 2 51 3 51 3 76 50 15 2 2 51 3 51 3 76 55 16 8 2 51 3 76 3 76 60 18 3 3 76 3 76 3 76...

Страница 5: ...HEAT EXCHANGER ASSEMBLY CONDENSER COIL CONTROL TRANSFORMER CONTROL VOLTAGE CIRCUIT BREAKER WARM HEADER COLLECTOR BOX COLD HEADER COLLECTOR BOX TWO SPEED COMBUSTION AIR INDUCER COMBUSTION AIR ORIFICE...

Страница 6: ...tom return or cut out side return as required for return air duct connec tion A Make Up Box Figure 3 The line voltage make up box is shown in figure 3 The box may be installed inside or outside the un...

Страница 7: ...mbly for flame viewing Always operate the unit with the burner box cover in place Burn ers can be removed as an assembly for service Burner main tenance and service is detailed in the MAINTENANCE sec...

Страница 8: ...it open Units with board 63K8901 or 24L85 Limit must close within 5 trials for ignition or board goes into one hour limit Watchguard Units with board 56L83 or 97L48 Limit must close within 3 minutes o...

Страница 9: ...After the 15 second pre purge period the SureLight ignitor warms up for 20 seconds after which the gas valve opens for a 4 second trial for ignition G32 units with board 63K89 24L85 or 56L83 the ignit...

Страница 10: ...tion board The board can be uti lized in three modes with a SINGLE STAGE thermostat a TWO STAGE thermostat or with a second stage high fire delay called W2 TIMED The two stage board is equipped with a...

Страница 11: ...a successful ignition the SureLight control utilizes less power to energize the ignitor on successive calls for heat The control continues to ramp down the voltage to the ignitor until it finds the l...

Страница 12: ...ter the cool demand has been satisfied can be adjusted by flipping dip switch 4 The unit is shipped with a factory fan off setting of 45 seconds Fan off time will affect comfort and is adjustable to s...

Страница 13: ...Low Cool and Continuous Fan Speed TABLE 8 Integrated Control Board 5 Pin Terminal PIN Function 1 Ignitor 2 Combustion Air Inducer High Speed 3 Combustion Air Inducer Low Speed 4 Combustion Air Inducer...

Страница 14: ...urners failed to ignite OR limit open more than 3 minutes OR lost flame sense 5 times in one heating cycle OR pressure switch opened 5 times in one heating cycle SLOW FLASH OFF Flame sensed without ga...

Страница 15: ...temperature limit located on the right side of the burner box assembly see figure 16 S47 is wired to the burner ignition control A92 When S47 senses flame rollout indicating a blockage in the combust...

Страница 16: ...box Both switches are a single pole single throw normally open pressure switch electrically connected in series with the igni tion control The purpose of the switch is to prevent burner operation if...

Страница 17: ...s are farther from zero figure 19 the unit may have a restricted flue inlet or other problem Measuring pressure differential The differential pressure is the difference in pressure mea sured on either...

Страница 18: ...end of pipe NOTE Time is critical at this stage Do not allow primer to dry before applying cement 7 Immediately after applying last coat of cement to pipe and while both inside socket surface and end...

Страница 19: ...ould cause an unsafe condition 3 Insofar as is practical close all building doors and win dows and all doors between the space in which the ap pliances remaining connected to the common venting system...

Страница 20: ...f exhaust pipe must be painted or wrapped to protect insula tion from deterioration NOTE During extremely cold temperatures below approximately 20 F 6 67 C units with long runs of vent pipe through un...

Страница 21: ...CUMULATION UNCONDITIONED SPACE 12 305 MIN for 2 51 20 508 MAX for 3 76 8 203 MIN 1 2 13 FOAM INSULATION 1 2 13 FOAM INSULATION IN UNCONDITIONED SPACE PROVIDE SUPPORT FOR INTAKE AND EXHAUST LINES EVERY...

Страница 22: ...2 x 1 1 2 51 x 38 REDUCER BUSHING LOCATION FOR OFFSET TERMINATION Optional Turndown Not Shown May Be Used on Intake Only FIGURE 28 METAL OR PLASTIC STRAPPING OR LARGE WIRE TIES 10 Suspend piping using...

Страница 23: ...TAKE VENT GRADE GRADE EXHAUST VENT INTAKE VENT 34 864 12 305 9 229 NOTE Enclosed exhaust pipe is insulated with 1 2 13mm foam insulation If intake and exhaust pipes are reversed slit and remove foam i...

Страница 24: ...nent manner and must be water tight Teflon tape is recommended to seal the joint For Right Hand Side Condensate Exit Install the nipple adapter assembly from the outside of the cabinet and insert the...

Страница 25: ...own the walls of the flue pipe and into drain hose 5 Water drains down through the flue drain hose and is emptied into the header box con densate trap 6 When the cold header box condensate trap is ful...

Страница 26: ...ition system DO NOT attempt to manually light burners on this furnace Each time thermostat calls for heat burners will be automatically lit The ignitor does not get hot when there is no call for heat...

Страница 27: ...CO One method for testing the CO2 CO content is the Bachar ach CO2 test with the Fyrite CO2 indicator Other methods of testing CO2 CO are available Closely follow the instruc tions included in the te...

Страница 28: ...test gauge to outlet tap on gas valve 2 Disconnect pressure sensing hose from gas valve and plug hose Leave hose barb on valve open to at mosphere See figure 39 3 Start unit on high fire and allow 5 m...

Страница 29: ...within the range of AIR TEMP RISE F listed on the unit rating plate To Measure Temperature Rise 1 Place plenum thermometers in the supply and return air plenums Locate supply air thermometer in the fi...

Страница 30: ...rd See figure 8 Unused taps must be secured on dummy terminals PARK M1 and or PARK M2 on the SureLight board The heating tap is connected to the ACB HEAT terminal and the cooling tap is connected to t...

Страница 31: ...standard right hand threads 14 Disconnect the drain hose from the flue transition to the elbow on the cold header collector box trap 15 Disconnect the 3 pin plug from the combustion air blower at the...

Страница 32: ...rom installation manu al light and run unit for 5 minutes to ensure heat ex changer is clean dry and operating safely Cleaning the Burner Assembly NOTE Surgical mask and safety glasses should be worn...

Страница 33: ...are tight to ensure a leak tight burn er box Tighten the two screws underneath the box Again inspect the grommet to ensure a tight seal 19 Tighten the two screws holding the manifold bracket to the ve...

Страница 34: ...IRE IN J69 G C R Y FLAME ROLLOUT SWITCH W2 W1 W2 TWO STAGE RELAY CONTROL PIGTAIL FURNACE MAY BE CONTROLLED BY EITHER A SINGLE OR TWO STAGE THERMOSTAT TWO STAGE THERMOSTAT SHOWN FUSED DISCONNECT OR CIR...

Страница 35: ...Page 35 G32 2 UNIT DIAGRAM...

Страница 36: ...Page 36 G32 3 UNIT DIAGRAM...

Страница 37: ...gizes combustion air blower B6 on low speed Combustion air blower runs until com bustion air blower switch S102 or S128 onG32 75 units closes switch will close within 2 1 2 minutes or control goes int...

Страница 38: ...VE OFF COMBUSTION AIR INDUCER ON INDOOR BLOWER ON LED 1 SLOW FLASH LED 2 OFF GAS VALVE OFF COMBUSTION AIR INDUCER OFF INDOOR BLOWER OFF DELAY LED 1 OFF LED 2 SLOW FLASH Sequence holds until pressure s...

Страница 39: ...TAGE HEAT FLAME PRESENT Continuous flame check FLAME SIGNAL u0 60 microamps PRIMARY LIMIT SWITCH CLOSED ROLLOUT SWITCH CLOSED PRESSURE SWITCH CLOSED CONTINUED ON NEXT PAGE CONTROL CHECKS RETRY FOR IGN...

Страница 40: ...SSURE SWITCH CLOSED HIGH HEAT GAS VALVE OPEN 8 SEC DELAY GAS VALVE DE ENERGIZED INDOOR BLOWER DE ENERGIZED COMBUSTION AIR INDUCER ON FOR 2 5 MINUTES NO PRESSURE SWITCH CLOSED PRESSURE SWITCH WATCHGUAR...

Страница 41: ...UNCHANGED THROUGHOUT COOLING CYCLE THERMOSTAT CALLS FOR COOLING COMPRESSOR CONTACTOR AND SYSTEM FAN ENERGIZED WITH 0 SECOND DELAY COOLING SPEED ACC TERM ENERGIZED COMPRESSOR OFF THERMOSTAT OPENS SYST...

Страница 42: ...Y THERMOSTAT OPENS COMBUSTION AIR AND HTG ACC TERMINAL DE ENERGIZE SYSTEM FAN SWITCHED TO ACB COOL SPEED ACC TERM REMAINS ON THERMOSTAT OPENS BOARD 63K89 SYSTEM FAN OFF ACC TERM OFF AFTER OFF DELAY CO...

Страница 43: ...Page 43 TYPICAL G32 5 6 SCHEMATIC WIRING DIAGRAM...

Страница 44: ...ve remains on first stage heat ignitor de energizes 8 After 45 second delay indoor blower B3 is energized on low heat speed The furnace will stay in this mode until first stage de mand is satisfied OR...

Страница 45: ...DS 1 SIMULTANEOUS FAST FLASH DS 2 SIMULTANEOUS FAST FLASH YES PRIMARYLIMIT SWITCH CLOSED YES NO COMBUSTION AIR INDUCER OFF INDOOR BLOWER ON HAS PRIMARY LIMIT RESET WITHIN 3 MINUTES DS1 SLOW FLASH DS2...

Страница 46: ...EPLACED OR RECONNECTED DS1 AND DS2 ALTERNATING FAST FLASH YES AT END OF IGNITOR 20 SECOND WARM UP PERIOD 4 SECOND TRIAL FOR IGNITION GAS VALVE OPENS IGNITOR ENERGIZED DURING 4 SECOND TRIAL UNTIL FLAME...

Страница 47: ...LAY DS1 OFF DS 2 SLOW FLASH NO YES C FIRST STAGE HEAT DEMAND SATISFIED DS1 AND DS2 SIMULTANEOUS SLOW FLASH GAS VALVE OFF COMBUSTION AIR INDUCER OFF FOLLOWING POST PURGE INDOOR BLOWER OFF WITH DELAY DS...

Страница 48: ...ED BEFORE RETRY WERE 5 ATTEMPTS MADE FOR SECOND STAGE HEAT YES NO SEE BOX C FIRST STAGE HEAT DEMAND SATISFIED HEAT DEMAND SATISFIED DS1 AND DS2 SIMULTANEOUS FAST FLASH YES TWO STAGE THERMOSTAT MODE E2...

Страница 49: ...HOLDS UNTIL VOLTAGE RISES ABOVE 75 VOLTS NO YES NO SIGNAL IMPROPER GROUND AT DS SIGNAL HOLDS UNTIL UNIT IS PROPERLY GROUNDED INDOOR BLOWER ENERGIZED ON FIRST STAGE COOL SPEED AFTER 2 SECOND DELAY FIR...

Страница 50: ...ED YES NO THERMOSTAT CALLS FOR SECOND STAGE HEAT YES INDOOR BLOWER SWITCHES TO HIGH HEAT SPEED AFTER 30 SECOND RECOGNITION PERIOD SECOND STAGE HEAT DEMAND SATISFIED YES YES INDOOR BLOWER RAMPS DOWN TO...

Страница 51: ...t 1 2 1 Roll out switch open ACTION 1 Manually reset the roll out switch by pushing the top button ACTION 2 Determine the cause of the roll out switch activation before leaving furnace Diagnostic ligh...

Страница 52: ...n air blower will cycle 5 seconds on 55 seconds off LED 1 Alternating Fast Flash LED 2 Alternating Fast Flash 2 1 2 Broken or failed ignitor ACTION 1 Unplug ignitor and read resistance across ignitor...

Страница 53: ...itch failure code 2 5 minutes after heating demand 4 1 2 Pressure switch does not close due to obstructions in the pressure tubing ACTION 1 Remove any obstructions from the pressure tubing and or taps...

Страница 54: ...ts off prior to satisfying T stat demand Diagnostic lights flash the pressure switch code 6 1 2 Condensate drain line is not draining properly ACTION 1 Check condensate line for proper vent slope and...

Страница 55: ...ge if possible high tem perature silicon is recommended replace heat exchanger if necessary tag and return heat ex changer to proper Lennox personnel 6 3 4 Insufficient flow through the heat ex change...

Страница 56: ...CONTROL SIGNALS LOW FLAME SENSE DURING HEATING MODE Condition Possible Cause Corrective Action Comments 7 0 Unit operates correctly but the diag nostic lights flash low flame sense code 7 1 1 Sense ro...