Step 4.

 Fireplace should be secured to side

framing members using the full length nailing
tabs at the top and bottom of the fireplace front
face.  Use 8d nails or equivalent (

Figure 17 ).

For remodeling, plumb to center of flue collar
from ceiling above, drive nail through ceiling
from below to mark position, then mark and
cut to passage from above ceiling (around
nail) (

Figure 18 ). Then plumb from ceiling or

roof level directly above hole which has just
been completed.

Figure 17

Note:

 The nailing tabs and the area directly

behind the nailing tabs are exempt from the
clearances described on page 5.  Maintain at
least 1/2" clearance from the firebox wrapper to
the framing at the closest point of contact,
directly adjacent to the flange.

INSTALLING THE CHIMNEY SYSTEM

Step 1.

 Before continuing, check the operation

of the damper, as described on page 4, (

refer to

Figure 3 ).

Step 2.

 Using standard construction framing

techniques, construct opening for chimney route
up through the ceiling(s) and roof or through an
outside chase.

Framing must maintain adequate minimum air
space clearance at all times.

CAUTION: ALLOW MINIMUM 2" CHIMNEY
AIR SPACE TO COMBUSTIBLE FRAMING MEM-
BERS THROUGHOUT VERTICAL OR OFFSET
CHIMNEY INSTALLATION.

A minimum 2" air space must be reserved for
all combustible materials extending for any
continuous length surrounding the chimney.

Reference 

Figures 15 and 16 and charts Fram-

ing Dimensions for Ceiling and Roof, which
specify minimum ceiling and roof dimensions.

In new construction, to determine chimney cen-
ter line, use plumb line from roof or ceiling above
fireplace to center of flue collar on fireplace.

Figure 18

Step 3.

 Position appropriate firestop spacer at

ceiling and nail temporarily with two (2) 8d
nails. Use flat firestop spacer, Model F10FS-2,
if chimney penetrates ceiling vertically. If chim-
ney penetrates ceiling at 30

°

 angle (offset

chimney), use 30

°

 firestop spacer, Model

F10FS30-2. Use one nail on opposite sides to
hold firestop spacer in position. Nail perma-
nently, using at least two (2) more 8d nails,
after chimney sections have been assembled
through the firestop spacer and after any nec-
essary adjustments have been made. Firestop
spacer must be secured by at least four (4) 8d
nails when completely installed.

Note:

 If there is a room above ceiling level,

firestop spacer must be installed on the bottom
side of the ceiling. If an attic is above ceiling
level, firestop spacer must be installed on top
side of ceiling joist (Figures 19 and 20 ).

Figure 19

Firestop Spacer

Room Above

Firestop Spacer

Attic Above

Figure 20

CHIMNEY 30

°

 OFFSET THROUGH FLOOR

OR CEILING

It may be necessary to assemble the chimney at
30

°

 when passing through the floor or ceiling

area.  Use the F10FS30-2 firestop spacer as
shown in 

Figures 21 and 22.  Support the

chimney at floor or ceiling penetration with a
FTF10 stabilizer if distance of chimney below
ceiling is 10' or more. Maintain 2" minimum air
space to combustibles from chimney sections.

Figure 21

Figure 22

F10FS30-2

Firestop Spacer

FTF10-S4

Stabilizer

2" Min.

Air Space

30

°

 Firestop

And Attic Above

10'

Max.

Attic Space

2" Min.

Air Space

F10FS30-2

Firestop Spacer

FTF10-S4

Stabilizer

30

°

 Firestop

And Room Above

10'

Max.

Room Above

2" Min.

Air Space

2" Min.

Air Space

8d Nail Or
Equivalent

Содержание Elite LA41TCF

Страница 1: ...not alter or modify the fireplace or its components under any circumstances Any modification or alteration of the fireplace system including but not limited to the fireplace chimney components and acc...

Страница 2: ...damage as a result of handling or transporta tion These items should be inspected by your distributor or qualified factory representative to ensure safe condition When in doubt con sult your distribut...

Страница 3: ...e fireplace systems are designed for in stallation in accordance with the National Fire Protection Standard for chimneys fireplaces and solid fuel burning appliances NFPA 211 and in accordance with co...

Страница 4: ...avoid overhead obstructions such as trees power lines etc A chase should be constructed and insulated just like any outside wall In a cold climate we recommend the base of the chase should also be ins...

Страница 5: ...nd the fireplace positioned into the opening Usually no special floor support is needed for the fireplace however to be certain 1 Estimate the total weight of the fireplace system including chimney an...

Страница 6: ...movement Note The Z type safety strip is not supplied Step 3 Refer to fireplace drawings and specifi cationsonpages6and7forframingdimensions and details Frame appliance enclosure as illus trated in F...

Страница 7: ...uding Finising Materials if any Rough Framing Face Unfinished Shown FOAK Combustion Air Kit Optional Framing Dimensions for Roof Pitch C D 0 12 19 19 483 mm 483 mm 6 12 19 22 483 mm 559 mm 12 12 19 27...

Страница 8: ...o determine chimney cen terline useplumblinefromrooforceilingabove fireplace to center of flue collar on fireplace Figure 18 Step 3 Position appropriate firestop spacer at ceiling and nail temporarily...

Страница 9: ...r section down into respective section of proceeding flue pipe and locking outer stabi lizer section into place over the outer chimney pipe Position for proper clearance through framedopeningandnailst...

Страница 10: ...ngaged Using a FTF10 CTDT Chase Termination Refer to specific installation instructions in cluded with the FTF10 CTDT chase termination for clearance and installation details Using a FTF10 CT1 Chase T...

Страница 11: ...y Chimneys 30 offset and return elbows Use two elbows an offset elbow to initiate the offset and a return elbow to terminate it A 30 offset elbow angling in any direction may be the first component us...

Страница 12: ...6 2 0 8 300 25 0 1 1 8 308 25 8 0 0 9 318 26 8 1 0 9 324 27 0 0 1 9 328 27 4 2 0 9 334 27 10 1 1 9 342 28 6 0 0 10 352 29 4 1 0 10 Height Of Number Of FTF10 Chimney Only Chimney Lengths Inches Feet In...

Страница 13: ...tep2 ProceedbyusingtheStraightUpInstal lation Instructions for cutting and framing ceil ing and roof openings FTF10 OFFSET ELEVATION CHART A B FTF10 ES30 Number of FTF10 Offset Height Offset Return FT...

Страница 14: ...OPTIONAL EQUIPMENT CONSIDERATIONS Gas Line Connection Install a gas supply line through fireplace wall for connection to a decorative gas appli anceinsidethefirebox Outside thegassupply line connects...

Страница 15: ...y sit directly on a combus tible surface A 2 air space is required be tween combustible framing and the chimney Combustible mantels and trim may be in stalled 12 above the fireplace opening as per NFP...

Страница 16: ...r the k value or r value is known use either the k formula or r formula Example If Micore 160 is to be used for the hearth extension fireplace how thick must this material be kM k value per inch of al...

Страница 17: ...ville 54 1 85 64 5 8 Face brick 9 00 111 10 71 10 3 4 Common brick 5 00 20 5 95 6 Cement mortar 5 00 20 5 95 6 Ceramic tile 12 5 08 14 88 14 7 8 Marble 11 09 13 10 13 1 8 Table 1 Calculating Minimum T...

Страница 18: ...extension used must be equal to or greater than R r x TL 3 70 x 1 3 70 If it is desired to elevate a marble hearth exten sion to a level of 5 or more above the floor surface What combination of noncom...

Страница 19: ...lar 63L59 FSC 63L40 F10F6 Flashing 63L41 F10F12 Round Termination 63L423 FTF10 CTD Chase Termination Square 63L49 FTF10 CT1 Firestop Spacer Flat 63L36 F10FS 2 Chase Termination Round 63L46 FTF10 CTDT...

Страница 20: ...ges at any time without notice in design materials specifications prices and also to discontinue colors styles and products Consult your local distributor for fireplace code information Printed in U S...

Отзывы: