background image

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

25

17"

14"

Min. Distance To

Unprotected Side Wall

¹⁄₄

"

45

°

Combustible Materials

Allowed In Shaded

Area “Safe Zone”

12"

5"

Min. Distance

To Protected

Side Wall

Top View Of

Fireplace

Side

Wall

Side

Wall

Combustible materials may project beyond the
sides of the fireplace opening as long as they
are kept within the shaded areas illustrated in
Figure 44.

Figure 44

12 (305) MANTEL

10 (254) MANTEL

8 (203) MANTEL

6 (152) MANTEL

4 (102) MANTEL

16

(406)

12

(305)

10

(254)

2 (51) MANTEL

TOP OF
APPLIANCE

6

(152)

8

(203)

MANTEL CLEARANCES

Inches (mm)

14

(356)

Figure 43

COLD CLIMATE INSULATION

For cold climate installations, seal all cracks around your appliance with noncombustible material and wherever cold air could enter the room. It is
especially important to insulate outside chase cavity between studs and under floor on which appliance rests, if floor is above ground level.  Gas line
holes and other openings should be caulked or stuffed with unfaced fiberglass insulation.  In cold climates, if the fireplace is being installed on a cement
slab, a sheet of plywood or other raised platform can be placed underneath to prevent conducting cold up into the room.  It also helps to sheetrock
inside surfaces and tape for maximum air tightness and caulk firestops.

A hearth extension is not required with this appliance. If a hearth extension is used, do not block the lower control compartment door. Any hearth
extension used is for appearance only and does not have to conform to standard hearth extension installation requirements.

Note: Combustible wall finish materials and/or surround materials must not be allowed to encroach the area defined by the appliance
front face (black sheet metal). Never allow combustible materials to be positioned in front of or overlapping the appliance front face. See
Figure 42 on page 24.

Non-combustible materials, such as surrounds and other appliance trim, may be installed on the appliance front face with this exceptions: they must
not cover any portion of the glass.

Vertical installation clearances to combustible mantels vary according to the depth of the mantel.  See 

Figure 43.  Mantels constructed of non-

combustible materials may be installed at any height above the appliance opening; however, do not allow anything to hang below the hood.

Содержание Elite ELDV-35NE

Страница 1: ...terrupteur Nepasvousservir des t l phones se trouvant dans le batiment o vous vous trouvez Evacuez la pi ce le b timent ou la zone Appelez imm diatement votre fournisseur de gaz depuis un voisin Suive...

Страница 2: ...l compartment cover strapped to the top of the unit GENERAL INFORMATION Note Installation and repair should be per formed by a qualified service person The appli ance should be inspected annually by a...

Страница 3: ...r use with other gases unless a certified kit is used Cet appareil peut tre install dans un maison pr fabriqu e U seulement ou mobile d j install e demeure si les r glements locaux le permettent Cet a...

Страница 4: ...itioning ducting Thesedirectventappliancesareuniquelysuited for installations requiring a utility shelf posi tioneddirectlyabovethefireplace Utilityshelves like these are commonly used for locating te...

Страница 5: ...Vertical Wall Vent Termination Storm Collar Concentric Vent Pipe Flashing 1 inch 25 4 mm Minimum Clearance to Combustibles h c t i P f o o R H t e e f 2 1 6 o t t a l F 0 1 2 1 7 o t 2 1 6 r e v O 5...

Страница 6: ...arance to combustible framing mem bers as shown in Table 2 on page 4 Iftheapplianceistobeelevatedabovefloorlevel asolidcontinuousplatformmustbeconstructed Headers may be in direct contact with the app...

Страница 7: ...i l r e t n e c f o e d i s n i h c a e o t e c n a r a e l C H y l b m e s s a r o t a l u g e r r e t e m e v o b a d e d n e t x e t e e f 5 1 f o t h g i e h a n i h t i w m c 1 9 t e e f 3 y l b...

Страница 8: ...e constructed of 2x4 or larger lumber Inches mm 130 C is the required framing depth dimension when the finish material drywall thickness is 1 2 in 13mm A C l e d o M o N A B C D E 5 3 V D L E n i 6 1...

Страница 9: ...N A B C D E F G H 5 3 V D L E n i 8 1 0 4 8 1 7 3 8 5 5 2 8 1 9 2 8 1 5 3 2 1 1 2 4 3 0 1 2 1 2 3 m m 1 9 0 1 3 4 9 1 5 6 0 4 7 2 9 8 6 4 5 3 7 2 5 2 8 0 4 V D L E n i 8 1 0 4 8 1 7 3 8 5 5 2 8 1 4 3...

Страница 10: ...6 mm and 46 1 2 1181 mm net section lengths are available Plan the vent lengths so that a joint does not occur at the intersection of ceiling or roof joists Refer to the Vent Section Length Chart The...

Страница 11: ...1 0 0 0 5 6 5 1 4 2 5 2 1 0 2 0 0 0 7 0 7 6 4 2 5 0 2 1 0 0 7 0 8 2 5 2 1 2 0 1 0 7 0 8 4 6 2 2 2 0 0 1 7 0 8 6 7 2 3 2 0 0 0 8 0 8 9 7 2 5 2 3 2 0 0 0 0 6 6 5 0 8 2 5 7 3 3 2 1 0 0 8 0 9 5 3 8 2 5 2...

Страница 12: ...ngth may be used to secure the support straps to the vent pipe See Figure 17 Push the vent component against the collar untilitfullyengages thentwistthecomponent clockwise runningthedimplesdownandalon...

Страница 13: ...is of their initial collar section to align with the required direction of the next vent run element Twist elbow sections in a clockwise direction only so as to avoid the possiblity of unlocking any o...

Страница 14: ...ee el bows are used Note It is very important that the horizontal inclined run be maintained in a straight no dips and recommended to be in a slightly elevated plane in a direction away from the firep...

Страница 15: ...using Secure Flex use Firestop Spacer SF4 5HF Min One Foot Vent Section Required B E L B A T V M M U M I N I H H 1 m u m i x a M t e e f m t e e f m 2 1 0 6 0 5 4 2 5 1 3 4 1 9 0 0 1 1 3 4 2 2 1 5 1 5...

Страница 16: ...sections On the vertical run support the venting sys tem every 8 feet 2 4m above the fireplace vent outlet with field provided support straps Plumber s tape Attach the straps to the vent pipe and secu...

Страница 17: ...ttached see Figure 28 Iftheterminusofthelastsectionisnotwithinthis distance use the telescopic vent section SV4 5LA as the last vent section For wall thick nesses greater than that shown in Figure 28...

Страница 18: ...nt SF4 5HF SecureFlex firestop spacermustbeused anytime vent pipe passes through a combustible wall Note Secure Vent components rigid vent pipe and terminal are shown inthefigures SecureFlexcomponents...

Страница 19: ...m u m i x a M H t e e f m t e e f m 2 1 0 6 0 4 1 3 1 9 9 0 3 4 1 9 0 5 7 6 8 2 2 4 2 2 1 4 3 0 1 6 7 2 3 5 4 2 5 1 4 1 7 6 2 4 6 9 2 7 1 4 1 7 1 8 5 2 5 7 4 3 1 2 0 2 2 6 x a M m 4 2 1 t e e f 0 4 H...

Страница 20: ...nd of the adapter over the previously installed section or appli ance collar adjusting the radial alignment until the four locking dimples of the adapter are aligned with the inlets of the four inclin...

Страница 21: ...s red pigtail lead and the white power supply wire to the common terminal of the outlet as shown in Figure 35 5 Connectthegroundsupplywiretothepigtail lead attached to outlet s green ground screw 6 A...

Страница 22: ...cess plate opening Bring the shutoff valve on the end of the flex line over to the hard pipe and tighten with wrenches from above through the firebox opening If required access the valve by removing t...

Страница 23: ...ening using the provided screws 4 as shown in Figure 37 Referto Figure41andloosenthesetscrewfor the venturi air shutter Manually actuate the air shutter through several cycles Set the air shutter to 3...

Страница 24: ...s shown in the table in Figure 41 Allow the burner to operate for at least 20 minutes WARNING AIR SHUTTER ADJUST MENT SHOULD ONLY BE PER FORMED BY A QUALIFIED PROFES SIONAL SERVICE TECHNICIAN IMPORTAN...

Страница 25: ...b a sheet of plywood or other raised platform can be placed underneath to prevent conducting cold up into the room It also helps to sheetrock inside surfaces and tape for maximum air tightness and cau...

Страница 26: ...e d u l c n i s t i k n o i t a n i m r e t e s e h T 9 6 9 1 H 2 T H 5 4 F S n o i t a n i m r e T e r a u q S l a t n o z i r o H x e l F t u o h t i w 7 8 L 7 7 2 1 T I K F S n i 2 1 h t i w m r e...

Страница 27: ...FIED SERVICE AGENCY IN ACCORDANCE WITH THE MANUFACTURER S IN STRUCTIONS AND ALL APPLICABLE CODES AND REQUIREMENTS OF THE AUTHORIZED HAVING JURISDICTION IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT...

Страница 28: ...Turn on gas supply and test for gas leaks All Models Step 8 Refer to Figure 45 on page 27 A Remove the orifice from the manifold and replace it with the one provided in the kit See the following table...

Отзывы: