background image

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

17

Horizontal terminations have been designed to perform in a wide range of weather
conditions.  Our terminations meet or exceed industry standards.

When selecting the locations of your horizontal terminations, do not place the
termination where water from eaves and adjoining rooflines may create a heavy flow
of cascading water onto the termination cap.  If the cap must be placed where the
possibility of cascading water exists, it is the responsibility of the builder to direct the
water away from the termination cap by using gutters or other means.

Take care to carefully follow the installation instructions for the termination, including
the use of silicone caulking where required.

Figure 27

Figure 28

Installing the Square Horizontal Termination (SV4.5HT-2)

M. Install the desired termination -

1. Install the square termination (SV4.5HT-2)-
For the last step , from outside the exterior wall,
slide the collars of the termination onto the
adapter (the outer over the outer and the inner
inside the inner) until the termination seats against
the exterior wall surface to which it will be
attached.  Orient the housing of the termination
with the arrow pointed upwards.  Secure the
termination to the exterior wall.  The horizontal
termination must not be recessed into the
exterior wall or siding
 by more than the 1-1/4"
(32 mm) as shown in 

Figure 28.

SVHRK Snorkel Cap –The snorkel cap is de-
signed to be fitted into a basement window
box.  The SVHRK cap is for use with flex vent
The vertical distance between the inlet and
outlet of the cap is 28 in. (711 mm). pipe.

K.  Attach termination adapter - Attach the
adapter (adapter - SV4.5RCH - provided with
the  termination) to the vent section or tele-
scoping vent section), elbow or appliance col-
lar as shown in 

Figure 27  in the same manner

as any SV4.5 vent component (refer to Step E).

J. Assemble vent run to exterior wall - If not
previously measured, locate the center of the
vent at the exterior wall.  Prepare an opening as
described in Step B.  Assemble the vent system
to point where the terminus of the last section is
within 7 in. (178 mm) to 11-1/4 in. (286 mm)
inboard of the exterior surface to which the SV4.5
HT termination is to be attached, see 

Figure 28.

If the terminus of the last section is not within this
distance, use the telescopic vent section
SV4.5LA, 
as the last vent section. For wall thick-
nesses greater than that shown in 

Figure 28,

refer to 

Table 3 on page 18. This table lists the

additional venting components needed (in addi-
tion to the termination and adapter) for a particu-
lar range of wall thicknesses.

L. Install Firestop/Spacer at exterior wall -
When using the square  termination, install
SV4.5HF (Secure Vent), SF4.5HF (Secure Flex)
Firestop/Spacer over the opening at the exte-
rior side of the framing, long side up, with the
3 inch spacer clearance at the top as shown in
Figure 27, and nail into place.

(The Firestop/Spacer may also be installed over
the opening at the interior side of the framing.)

It is important to maintain the required clear-
ances to combustibles: 1" (25 mm) at all sides
for all vertical runs; and 3" (76 mm) at the top,
1" (25 mm) at sides, and 1" (25 mm) at the
bottom for all horizontal/inclined runs

Firestop/Spacer (SV4.5HF) shown
on the exterior side of the wall. It

may also be installed on the

interior side.

SV4.5 HT-2

Termination

7"

(178)

5-1/8"

(130 mm)

12-1/8"

(308 mm)

Note: Centerline of Vent Piping is

NOT the Same as the Centerline of

the Frame Opening.

6 to 48 inch Vent Section,

Telescopic vent section,

Elbow or Appliance Collar

See Figure 9 on page 8

for Min. Distance to Base

of Appliance.

Base of Appliance

3"

(76 mm)

1"

(25.4 mm)

Adapter

SV4.5RCH

10-1/2"

(267 mm)

IMPORTANT:  The vent termination is hot
while in operation and for a period of time
following use of the fireplace.  To prevent
contact with hot surfaces, we recommend
the use of a Termination Guard.  This can be
purchased at your local dealer.

Siding

Stucco

1

¹⁄₄

" Maximum Recess of

the Square Termination into
Exterior Finishing Material

Exterior Surface of

Framing

5 in. to 9 

¹ ₄

 in.

(127 to 235 mm)**

Exterior Surface of Siding

Interior Surface of

Finished Wall

Maximum  wall thickness

10 in.(254 mm)**

SV4.5HT-2

Square Termination

Maximum Extent of

Vent Run Sections

Relative to Exterior

Surface of Framing

Last Vent Section. Use

T e l e s c o p i c   V e n t

Section (SV4.5LA), If

Necessary

Adapter

SV4.5RCH

SV4.5HT-2

Square Termination

Venting Connection and Exterior Wall Recessing of the

Horizontal Square Termination (SV4.5HT-2).

*Use silicone caulking to
seal the top and sides of
the termination, up to the
underlayment, stucco, or
masonry wall surface.

**For thicknesses greater
    than 10”, see Table 3.

*Caulk

*Caulk

Содержание Elite ELDV-35NE

Страница 1: ...terrupteur Nepasvousservir des t l phones se trouvant dans le batiment o vous vous trouvez Evacuez la pi ce le b timent ou la zone Appelez imm diatement votre fournisseur de gaz depuis un voisin Suive...

Страница 2: ...l compartment cover strapped to the top of the unit GENERAL INFORMATION Note Installation and repair should be per formed by a qualified service person The appli ance should be inspected annually by a...

Страница 3: ...r use with other gases unless a certified kit is used Cet appareil peut tre install dans un maison pr fabriqu e U seulement ou mobile d j install e demeure si les r glements locaux le permettent Cet a...

Страница 4: ...itioning ducting Thesedirectventappliancesareuniquelysuited for installations requiring a utility shelf posi tioneddirectlyabovethefireplace Utilityshelves like these are commonly used for locating te...

Страница 5: ...Vertical Wall Vent Termination Storm Collar Concentric Vent Pipe Flashing 1 inch 25 4 mm Minimum Clearance to Combustibles h c t i P f o o R H t e e f 2 1 6 o t t a l F 0 1 2 1 7 o t 2 1 6 r e v O 5...

Страница 6: ...arance to combustible framing mem bers as shown in Table 2 on page 4 Iftheapplianceistobeelevatedabovefloorlevel asolidcontinuousplatformmustbeconstructed Headers may be in direct contact with the app...

Страница 7: ...i l r e t n e c f o e d i s n i h c a e o t e c n a r a e l C H y l b m e s s a r o t a l u g e r r e t e m e v o b a d e d n e t x e t e e f 5 1 f o t h g i e h a n i h t i w m c 1 9 t e e f 3 y l b...

Страница 8: ...e constructed of 2x4 or larger lumber Inches mm 130 C is the required framing depth dimension when the finish material drywall thickness is 1 2 in 13mm A C l e d o M o N A B C D E 5 3 V D L E n i 6 1...

Страница 9: ...N A B C D E F G H 5 3 V D L E n i 8 1 0 4 8 1 7 3 8 5 5 2 8 1 9 2 8 1 5 3 2 1 1 2 4 3 0 1 2 1 2 3 m m 1 9 0 1 3 4 9 1 5 6 0 4 7 2 9 8 6 4 5 3 7 2 5 2 8 0 4 V D L E n i 8 1 0 4 8 1 7 3 8 5 5 2 8 1 4 3...

Страница 10: ...6 mm and 46 1 2 1181 mm net section lengths are available Plan the vent lengths so that a joint does not occur at the intersection of ceiling or roof joists Refer to the Vent Section Length Chart The...

Страница 11: ...1 0 0 0 5 6 5 1 4 2 5 2 1 0 2 0 0 0 7 0 7 6 4 2 5 0 2 1 0 0 7 0 8 2 5 2 1 2 0 1 0 7 0 8 4 6 2 2 2 0 0 1 7 0 8 6 7 2 3 2 0 0 0 8 0 8 9 7 2 5 2 3 2 0 0 0 0 6 6 5 0 8 2 5 7 3 3 2 1 0 0 8 0 9 5 3 8 2 5 2...

Страница 12: ...ngth may be used to secure the support straps to the vent pipe See Figure 17 Push the vent component against the collar untilitfullyengages thentwistthecomponent clockwise runningthedimplesdownandalon...

Страница 13: ...is of their initial collar section to align with the required direction of the next vent run element Twist elbow sections in a clockwise direction only so as to avoid the possiblity of unlocking any o...

Страница 14: ...ee el bows are used Note It is very important that the horizontal inclined run be maintained in a straight no dips and recommended to be in a slightly elevated plane in a direction away from the firep...

Страница 15: ...using Secure Flex use Firestop Spacer SF4 5HF Min One Foot Vent Section Required B E L B A T V M M U M I N I H H 1 m u m i x a M t e e f m t e e f m 2 1 0 6 0 5 4 2 5 1 3 4 1 9 0 0 1 1 3 4 2 2 1 5 1 5...

Страница 16: ...sections On the vertical run support the venting sys tem every 8 feet 2 4m above the fireplace vent outlet with field provided support straps Plumber s tape Attach the straps to the vent pipe and secu...

Страница 17: ...ttached see Figure 28 Iftheterminusofthelastsectionisnotwithinthis distance use the telescopic vent section SV4 5LA as the last vent section For wall thick nesses greater than that shown in Figure 28...

Страница 18: ...nt SF4 5HF SecureFlex firestop spacermustbeused anytime vent pipe passes through a combustible wall Note Secure Vent components rigid vent pipe and terminal are shown inthefigures SecureFlexcomponents...

Страница 19: ...m u m i x a M H t e e f m t e e f m 2 1 0 6 0 4 1 3 1 9 9 0 3 4 1 9 0 5 7 6 8 2 2 4 2 2 1 4 3 0 1 6 7 2 3 5 4 2 5 1 4 1 7 6 2 4 6 9 2 7 1 4 1 7 1 8 5 2 5 7 4 3 1 2 0 2 2 6 x a M m 4 2 1 t e e f 0 4 H...

Страница 20: ...nd of the adapter over the previously installed section or appli ance collar adjusting the radial alignment until the four locking dimples of the adapter are aligned with the inlets of the four inclin...

Страница 21: ...s red pigtail lead and the white power supply wire to the common terminal of the outlet as shown in Figure 35 5 Connectthegroundsupplywiretothepigtail lead attached to outlet s green ground screw 6 A...

Страница 22: ...cess plate opening Bring the shutoff valve on the end of the flex line over to the hard pipe and tighten with wrenches from above through the firebox opening If required access the valve by removing t...

Страница 23: ...ening using the provided screws 4 as shown in Figure 37 Referto Figure41andloosenthesetscrewfor the venturi air shutter Manually actuate the air shutter through several cycles Set the air shutter to 3...

Страница 24: ...s shown in the table in Figure 41 Allow the burner to operate for at least 20 minutes WARNING AIR SHUTTER ADJUST MENT SHOULD ONLY BE PER FORMED BY A QUALIFIED PROFES SIONAL SERVICE TECHNICIAN IMPORTAN...

Страница 25: ...b a sheet of plywood or other raised platform can be placed underneath to prevent conducting cold up into the room It also helps to sheetrock inside surfaces and tape for maximum air tightness and cau...

Страница 26: ...e d u l c n i s t i k n o i t a n i m r e t e s e h T 9 6 9 1 H 2 T H 5 4 F S n o i t a n i m r e T e r a u q S l a t n o z i r o H x e l F t u o h t i w 7 8 L 7 7 2 1 T I K F S n i 2 1 h t i w m r e...

Страница 27: ...FIED SERVICE AGENCY IN ACCORDANCE WITH THE MANUFACTURER S IN STRUCTIONS AND ALL APPLICABLE CODES AND REQUIREMENTS OF THE AUTHORIZED HAVING JURISDICTION IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT...

Страница 28: ...Turn on gas supply and test for gas leaks All Models Step 8 Refer to Figure 45 on page 27 A Remove the orifice from the manifold and replace it with the one provided in the kit See the following table...

Отзывы: