21
3.16. STARTING UP THE UNIT
Before starting up the cooling unit, the following operations must be performed:
-
Plug the unit into the mains. The display will switch on and the word OFF will appear.
-
If warm-up of the unit is required, it must remain in this state for at least three hours.
-
If the unit has a voltage monitor incorporated, it must remain turned to OFF for at least 7 minutes, so
that the monitor can run the calculation phase.
-
Adjust the cold room temperature.
-
Start up the unit by pressing the ON/OFF button.
Programming the cold room temperature:
-
Plug the unit into the mains. The word OFF will appear on the display.
-
To configure the desired work program, press the SET button and hold it down for three seconds.
The green pilot light will come on and the set value will appear on the display.
-
If you wish to change this value, press:
UP to increase it (never any higher than US).
DOWN to reduce it (never any lower than LS).
Press the SET button or wait for five seconds to view the cold room temperature again.
3.17. DIAGRAM OF THE UNIT ELECTRICAL SYSTEM
EUROMON units are characterised by a specific electrical installation, a diagram of which is enclosed with
this user and maintenance manual.
4. MAINTENANCE AND CLEANING
4.1. MAINTENANCE AND REPAIR OF THE UNIT
Suitable maintenance is a determining factor for the unit to remain in optimum operating and performance
conditions throughout a longer lifetime, and to guarantee the safety conditions established by the
manufacturer.
All maintenance operations must be carried out by qualified and trained technicians.
4.2. ORDINARY MAINTENANCE
To always obtain a good functioning of the equipment, it is necessary to periodically:
-Verify weekly that the evaporator is clean, without accumulation of ice.
-Monthly (at least) perform a cleaning of the condenser (the periodicity of this cleaning depends mainly on
CAUTION
24 hours after start-up, check the evaporator conditions. If ice has formed on it, you will need to
reduce the defrosting interval. For low temperature units, this inspection must be repeated once
a week during the first month of use.
CAUTION
Average temperature adjustment field: +10/ -5ºC
Low temperature adjustment field: -15/ -25ºC
Содержание Euromon 100 Series
Страница 1: ...INSTALLATION USER AND MAINTENANCE MANUAL Refrigeration monoblock EUROMON 01 2020...
Страница 2: ...1...
Страница 9: ...8...
Страница 27: ......