STEP 30
Attach H5 Roof Support, four-hole, centering countersink holes in H5 to C2
Posts on left side of Tower. H5 will sit on top of G4 Clubhouse Rail, pilot drill
with 3/16" bit using holes in H5 as guides, and fasten with 2-1/2” Lag Screws,
Internal Tooth Lock Washers and Flat Washers.
STEP 31
Now attach opposite H5 to C1 Post, again centering countersinks in Post. The
bottom of H5 will be flush with Top of Front and Back G2 Sculptured Rails,
again pilot drill with 3/16" bit and fasten with 2-1/2” Lag Screws, Internal Tooth
Lock Washers and Flat Washers.
STEP 32
Attach H1 Roof Supports flush with
outside of H5s, Front and Back of
Tower Structure and fasten with 2”
Wood Screws.
G4
H5
H5
H5
G4
C2
C2
C1
C1
C1
C1
C2
C2
H1
H1
G2
G2
G8
1 x 3-1/2 x 59-1/2 [ 2.54 x 8.89 x 151.13 ]
H1 Roof Support * 4 Holes * 2 Req
1 x 3-1/2 x 57 [ 2.54 x 8.89 x 144.78 ]
H5 Roof Support * 4 Holes * 2 Req
5/16 X 2-1/2"
LAG
SCREW
5/16"
LOCK
WASHER
INTERNAL
TOOTH
5/16" FLAT
WASHER
#8 X 2
WOOD
SCREW
"
© Copyright Playground Inc
Next Generation 5007 061206
Page 24
G2
G2