STEP 22
Drive 5/16” Spike T-Nuts into inside of C2 and
C1 Posts. Then attach G2 Sculptured Rails
to front and back of C2 and C1 Posts using
5/16 x 3-3/4” Hex Bolts, Internal Tooth Lock
Washers and Flat Washers.
L1
G1
G1
G3
G5
C2
C2
G2
G2
C1
C1
C2
C2
H3
1 x 5-1/2 x 57-1/2 [ 2.54 x 13.97 x 146.05 ]
G2 Arched Wall Rail * 4 Holes * 2 Req
L1 Floor Board * 4 Holes * 4 Req
11/16 x 4-1/2 x 39 [ 1.74 x 11.43 x 99.06 ]
© Copyright Playground Inc
Next Generation 5007 061206
Page 20
5/16 X 3-3/4"
HEX
HEAD
BOLT
5/16"
SPIKE TEE
NUT
5/16"
LOCK
WASHER
INTERNAL
TOOTH
5/16" FLAT
WASHER
#8 X 2
WOOD
SCREW
"
C2
C1
C1
C3
C3
G1
G1
G3
G6
G5
G7
STEP 21
Now is the time to position unit in
permanent spot. Secure the playset to
the ground by using the stakes in the
locations shown by the black circles.
Metal stake installation: Measure in 8”
from inside post and mark ground for
stake location. Now remove G5 and G6
base board to allow room to twist stake
into ground. You will need a long
screwdriver for leverage. In some cases
you may need to dig a hole to install stake
and cement. Now reattach the G5 and
G6 baseboards to the unit
Use hole in stake as guide to drill 3/8"
pilot hole thru base board use 1" phillips
truss head bolt, 5/16" flat washer thru
stake into baseboard 5/16" flat washer,
5/16" lock washer on barrel nut attach to
base board.
Attach another L1, four-hole Floor Board,
on bottom deck area between C2 Post
flush to outside of Left Baseboard using
2” Wood Screws.
Metal Stake
FLAT
WASHER
BOLT
LOCK
WASHER
B
O
A
R
D
FLAT
WASHER
BARREL
NUT
5/16"
METAL STAKES
Y41