STEP 24
Now install five M3 Floor
Boards on Top-Lower Floor
spacing evenly using 2” Wood
Screws.
STEP 25
At this point, install Lower Deck Floor
Boards, M3, using 2” Wood Screws
spacing fifteen M3 Floor Boards
evenly.
C1
C1
C1
C3
C3
C2
C2
L1
H7
M3
M3
11/16 x 3-3/8 x 47 [ 1.74 x 8.57 x 119.38 ]
M3 Floor Board * 5 Holes * 34 Req
© Copyright Playground Inc
Next Generation 5007 061206
Page 21
STEP 23
Attach G4, eight-hole, Clubhouse Wall Rail
to C2 Post using 5/16 x 3-3/4” Hex Bolts,
Internal Tooth Lock Washers, Flat Washers
and Spike T Nuts.
G2
G2
C1
C1
C2
C2
H3
H6
G4
1 x 5-1/2 x 47 [ 2.54 x 13.97 x 119.38 ]
G4 Club House Wall Rail * 8 Holes * 1 Req
5/16 X 3-3/4"
HEX
HEAD
BOLT
5/16"
SPIKE TEE
NUT
5/16"
LOCK
WASHER
INTERNAL
TOOTH
5/16" FLAT
WASHER
#8 X 2
WOOD
SCREW
"