Working with Reference Line
232
Configuring the checks
•
To Point(Stake)
. A point from Control Job selected in REFLINE
Reference Line/Arc Begin.
•
To Point(Store)
. A point from Job selected in REFLINE Reference
Line/Arc Begin.
•
To Line/Arc
. The direction of the orientation is parallel to the
reference line or the reference arc.
•
To Arrow
. The direction of the orientation is from the current
position to the point to be staked. The graphical display shows an
arrow pointing in the direction of the point to be staked.
To
•
To select the point to be used for orientation. Available for Orien-
tate=To Point(Stake) and Orientate=To Point(Store).
Field
Description of Field
To accept the screen entries and continue.
To change to another page on the screen.
To display information about the application
program name, the version number, the
date of the version, the copyright and the
article number.
Содержание GPS900 Series
Страница 1: ...Leica GPS900 Technical Reference Manual Version 1 0 English...
Страница 9: ...Table of Contents GPS900 9 Appendix E Cables 276 Index 278...
Страница 10: ...PART 1 The System GPS900 10 PART 1 The System...
Страница 106: ...Configuring the Radio Channel GPS900 106 Actual Freq The actual frequency of the radio Field Description of Field...
Страница 165: ...PART 2 The Applications GPS900 165 PART 2 The Applications...
Страница 275: ...Pin Assignments and Sockets GPS900 275 Sockets 8 pin LEMO 1 LEMO 1 8 pin LEMO HMI 1B 308 CLNP...