14
2 Mounting and starting
1. The spreader
(1)
is bolted to a special palette for transport.
Undo four screws
(3)
on the frame.
2. Position the spreader
(1)
on the load space of the carrier vehicle using
adequately sized handling equipment and lifting gear.
The eight feet
(4)
of the frame must stand on the load space. It must
be possible to lower the spreading device with out it striking the carrier
vehicle or base.
3. Secure the spreader
(1)
using suitable lashing straps to all four
lashing eyelets
(5)
.
4. Ensure that the lashing straps do not run over sharp edges, use
protective hoses.
5. If necessary, place the spreader
(1)
against the side board using
optional adjustable feet
(2)
.
6. Check the securing materials:
the spreader
(1)
must be secure on the carrier vehicle during operation
as well.
Caution!
Risk of equipment damage
Check the securing materials on the carrier vehicle before
starting any journey.