Turning on the Power
Before turning on the power, check the following items:
•
Ensure that the rope is tensioned properly. If it is too loose, it may short against the tube.
•
All station boards should be wired and plugged in.
•
All safety and final limit circuits should be wired.
•
The wires to the carriage should be properly connected and the carriage emergency
stop switch should be released.
•
All support pillars (if supplied) should be secure and the strut fasteners should be snug.
Note:
The strut fasteners will be fully tightened once the carriage landing locations
and stair clearances are checked.
Caution:
Do not ride on the lift until all of the fasteners have been fully
tightened!
Now you can switch on the building breaker, the drive box main switch. Look for the two fuses
F1/F2 in the control cabinet to be active.
If you encounter problems, refer to the user handbook or technical documentation.
•
Unfold the platform and run the unit out of the lower landing for a short distance using the
remote control.