Battery drawers

There are two different procedures for installing/replacing battery 
drawers inside UPS Trimod® and UPS BATTERY Trimod®. 
Carefully read all instructions before operating on the equipment.

The drawers batteries must always be added/replaced in multiples 
of 4 (1 KB).

Note: if the installation/replacement has changed the total number of 
KB installed in the UPS, you must update the number of KB via the 
front panel.
After completing the procedure above described, we recommand 
to calibrate batteries in order to get correct informations about UPS 
runtime.

If the UPS has more than 1 KB for each 10kVA output power, you can 
replace 1 KB at a time with UPS Online.
This operation can be done inside UPS Trimod® and/or UPS 
BATTERY Trimod®.
Remember that 1 KB consists of 4 battery drawers.

The replacement procedure is as follows:
1. Make sure the UPS has installed at least every 1KB 10kVA output 

power output plus one;

2. Make sure the UPS is not operating on battery and the charger is 

maintenance or standby state. To check the status of the charger, 
enter the state ups -> Measures -> batteries, and check the fourth 
item shown on the display.

3. Remove the four battery drawers (n° 1KB).
4. Insert the new 4 batteries drawers and secure them with the screws 

provided;

5. Repeat steps 2, 3 and 4 for each KB to install/replace.

In the case of simple addition of KB is enough to follow the steps 2, 4 
and 5.

• 

uPS Trimod® BATTERY Recommended Battery Fuse Ratings

• 

uPS Trimod® BATTERY/2 Recommended Battery Fuse Ratings

• 

uPS Trimod® BATTERY (1x94Ah) Recommended Battery Fuse Ratings

 WARNING

 

Always replace only 1 KB at a time

Note: If the UPS switches to battery while you are performing the 
operation, stop and do not remove or insert battery drawers! it is 
possible to resume operation when the UPS returns to work on-line.

Note: if during the operation mains is missing, you will have a reduced 
autonomy: you should therefore carefully consider such cases in 
relation to the application before starting.

Installation / replacement battery drawers in uPS maintenance 
bypass 

This procedure applies to each model of UPS Trimod® and UPS 
BATTERY Trimod®.

 WARNING

 

In maintenance bypass the load is powered directly from the 
mains input.

1. To bring the UPS in maintenance bypass mode follow steps 1 to 8 

described in paragraph 9.3.1.

2. Remove the four battery drawers (n° 1KB).
  To add another KB (if there is enough space available) does not 

remove any battery drawer;

3. Insert the new four batteries drawers and secure with the screws 

provided;

4. Repeat steps 2 and 3 for each KB to install / replace.
5. follow steps 1 to 6 described in section 9.4.2 to bring state of the 

UPS maintenance bypass switch to the On-line.

In the case of simple addition of KB is sufficient to perform the steps 
described in paragraphs 1, 3, 4 and 5.

POWER

BATTERY FuSE

Trimod® BATTERY 4KB

f B+

f B-

10/15/20/30/40/60 kVA

N.4 - 50A 500V gg (14 x 51)

N.4 - 50A 500V gg (14 x 51)

POWER

BATTERY FuSE

Trimod® BATTERY/2 5KB

f B+

f B-

10/15/20/30/40/60 kVA

N.5 - 50A 500V gg (14 x 51)

N.5 - 50A 500V gg (14 x 51)

POWER

BATTERY FuSE

Trimod® BATTERY (1x94Ah)

f B+

f B-

10 kVA

N.1 - 50A 500V gg (22 x 58)

N.1 - 50A 500V gg (22 x 58)

15/20 kVA

N.1 - 100A 500V gg (22 x 58)

N.1 - 100A 500V gg (22 x 58)

30 kVA TT/TM

N.2 - 80A 500V gg (22 x 58)

N.2 - 80A 500V gg (22 x 58)

40 kVA

N.2 - 125A 500V gg (22 x 58)

N.2 - 125A 500V gg (22 x 58)

60 kVA

N.3 - 100A 500V gg (22 x 58)

N.3 - 100A 500V gg (22 x 58)