61
DAKER DK Plus
1 kVA - 2 kVA - 3 kVA
EN
3 101 70
3 101 71
3 101 72
Rated Battery Voltage
36 Vdc
72 Vdc
72 Vdc
Backup time with 50%
linear load
> 10 min
> 10 min
> 8 min
Battery extension
Yes
Maximum charge current
2.1 Adc
1.5 Adc
1.5 Adc
Recharge time (to 90%)
4 hours
Communication and management
Screen and signalling
six pushbuttons and five LEDs for real-time control of the status
and the main parameters of the UPS
Communications ports
RS232 and USB
Connector for network interface
Software
Software for Windows and Linux environments is available in order to:
- displaying all the functioning and diagnostic data in case of problems;
- setup of special functions.
Download a copy free of charge from the website
http://www.ups.legrand.com
Protections
Against overloads and short-circuit
Backfeed
Emergency Power Off (EPO)
Overtemperature
Mechanical characteristics
Dimensions W x H x D (mm) 440 x 88 (2U) x 405
440 x 88 (2U) x 600
Net weight (kg)
16
29,5
30
Environmental conditions
Operating temperature
+20 ºC to +40 ºC
+32 ºF to +104 ºF
Operating relative humidity
20% to 80% (non-condensing)
Storage temperature
+20 ºC to +25 ºC
+ 68 ºF to +77 ºF
Noise level at 1 m
< 50 dB
IP code
IP 21
Heat dissipation (BTU/h)
490
654
818
Reference directive and standards
Safety
2014/35/EU Directive
EN 62040-1
EMC
2014/30/EU Directive
EN 62040-2
Performance and test
requirements
EN 62040-3
Содержание DAKER DK Plus 3 101 70
Страница 1: ...Part LE09705AB 06 17 01 GF DAKER DK Plus 1 kVA 2 kVA 3 kVA Manuel d installation Installation manual ...
Страница 9: ...DAKER DK Plus 1 kVA 2 kVA 3 kVA 9 FR 3 2 Configuration Tower 3 2 1 UPS Phase 1 Phase 2 ...
Страница 12: ...12 3 Installation Phase 5 Phase 6 ...
Страница 39: ...DAKER DK Plus 1 kVA 2 kVA 3 kVA EN 39 3 2 Tower configuration setup 3 2 1 UPS ...
Страница 40: ...40 3 2 2 UPS battery cabinet optional 3 Installation S1 ...
Страница 42: ...42 3 Installation ...
Страница 69: ...69 DAKER DK Plus 1 kVA 2 kVA 3 kVA IT 3 2 Impostazione configurazione tower 3 2 1 UPS Fase 1 Fase 2 ...
Страница 72: ...72 3 Installazione Fase 5 Fase 6 ...
Страница 99: ...99 DAKER DK Plus 1 kVA 2 kVA 3 kVA DE 3 2 Tower Konfiguration Setup 3 2 1 USV Schritt 1 Schritt 2 ...
Страница 102: ...102 3 Installation Schritt 5 Schritt 6 ...
Страница 129: ...129 DAKER DK Plus 1 kVA 2 kVA 3 kVA ES 3 2 Ajuste de la configuración de la torre 3 2 1 SAI Paso 1 Paso 2 ...
Страница 132: ...132 3 Instalación Paso 5 Paso 6 ...
Страница 159: ...159 ИБП DAKER DK Plus 1 кВA 2 кВA 3 кВA RU 3 2 Монтаж в вертикальном положении 3 2 1 ИБП Шаг 1 Шаг 2 ...
Страница 162: ...162 3 Монтаж Шаг 5 Шаг 6 ...
Страница 184: ...184 Appendix Battery replacement Phase 1 Phase 3 Phase 5 Phase 2 Phase 4 Phase 6 ...
Страница 193: ...193 ...
Страница 194: ...194 ...
Страница 195: ...195 ...