4.2
Operating modes
UPS OPERATING MODE
LEDs/DISPLAY INDICATION
BUZZER
NORMAL MODE
on-line, double conversion
LEDs: steady
,
,
DISPLAY:
No sound
STORED ENERGY MODE
The loads are supplied through
the batteries connected
to the UPS
LEDs: steady
,
,
DISPLAY:
Beep every
second
BYPASS MODE
The loads are supplied directly
from the mains. The UPS does
not protect the loads.
The UPS is in bypass mode after
a setting shortcut (paragraph
4.7), a generic alarm
or a prolonged overload
in normal mode.
LEDs: steady
,
,
DISPLAY:
Beep every two
seconds
ECO MODE
The loads are supplied directly
from the mains through
the automatic bypass circuit
inside the UPS. The output
voltage and frequency
are the same as the mains.
LEDs: steady
,
,
,
DISPLAY:
No sound
CVCF 50/60
The UPS maintains constant the
output voltage and the output
fre quency to 50 Hz or 60 Hz
according to the setting
LEDs: steady
,
,
DISPLAY:
No sound
See also paragraph 4.6 to set the operating mode.
Содержание DAKER DK Plus 3 101 70
Страница 1: ...Part LE09705AB 06 17 01 GF DAKER DK Plus 1 kVA 2 kVA 3 kVA Manuel d installation Installation manual ...
Страница 9: ...DAKER DK Plus 1 kVA 2 kVA 3 kVA 9 FR 3 2 Configuration Tower 3 2 1 UPS Phase 1 Phase 2 ...
Страница 12: ...12 3 Installation Phase 5 Phase 6 ...
Страница 39: ...DAKER DK Plus 1 kVA 2 kVA 3 kVA EN 39 3 2 Tower configuration setup 3 2 1 UPS ...
Страница 40: ...40 3 2 2 UPS battery cabinet optional 3 Installation S1 ...
Страница 42: ...42 3 Installation ...
Страница 69: ...69 DAKER DK Plus 1 kVA 2 kVA 3 kVA IT 3 2 Impostazione configurazione tower 3 2 1 UPS Fase 1 Fase 2 ...
Страница 72: ...72 3 Installazione Fase 5 Fase 6 ...
Страница 99: ...99 DAKER DK Plus 1 kVA 2 kVA 3 kVA DE 3 2 Tower Konfiguration Setup 3 2 1 USV Schritt 1 Schritt 2 ...
Страница 102: ...102 3 Installation Schritt 5 Schritt 6 ...
Страница 129: ...129 DAKER DK Plus 1 kVA 2 kVA 3 kVA ES 3 2 Ajuste de la configuración de la torre 3 2 1 SAI Paso 1 Paso 2 ...
Страница 132: ...132 3 Instalación Paso 5 Paso 6 ...
Страница 159: ...159 ИБП DAKER DK Plus 1 кВA 2 кВA 3 кВA RU 3 2 Монтаж в вертикальном положении 3 2 1 ИБП Шаг 1 Шаг 2 ...
Страница 162: ...162 3 Монтаж Шаг 5 Шаг 6 ...
Страница 184: ...184 Appendix Battery replacement Phase 1 Phase 3 Phase 5 Phase 2 Phase 4 Phase 6 ...
Страница 193: ...193 ...
Страница 194: ...194 ...
Страница 195: ...195 ...