Sleep Comfort™ Adjustable Base Owners Manual 99301076-b
10
steP 6
Remove the plastic packaging from the adjustable base frame. Carefully rotate
the base frame over to position the base top-side-up.
steP 7
Plug electrical power cord into a working, grounded electrical outlet.
Note: an electrical surge protection device is recommended (not included).
steP 8
Install batteries in remote control (4-AAA size, included). Briefly activate
all functions of the base with the remote control to verify all features are
in working order. If base does not operate, refer to the
Troubleshooting
section of this manual.
steP 9
Return base to the level position.
steP 10
Install mattress retainer at the foot end of the base as follows:
a. Locate grommeted holes at foot of base
(FIGURE 4).
GROMMETED
HOLES
FIGURE 4: Grommeted hole locations.
FOOT
END
OF
BASE
instaLLation
Содержание Sleep Comfort
Страница 1: ...99301076 b EDR12041 10 12 OWNERS MANUAL adjustable bases...
Страница 2: ......
Страница 23: ......