![Leenders WALD Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/leenders/wald/wald_installation-manual_1868036005.webp)
WALD
LEENDERS
2019.
49.002.I.EN
Installation option 2; fixing TO ceiling.
.
1. Mark out het ceiling plate
Use the cardboard template. Face
the flatbit to the rear. Mark the 12
holes on the ceiling.
2. Drill holes
Drill 6 holes distributed over the
ceiling plate. Pilot drill with Ø6, finish
with Ø14.
Should a position be difficult to drill
through, use one of the other
marked positions.
3. Securing ceiling plate
Use 6 anchors and M8x55
countersunk head bolts. The bolts
must not protrude form the ceiling
plate.
Please note: the construction of the ceiling must be appropriate for this
method of attachment.
Содержание WALD
Страница 1: ...WALD INSTALLATION EN...