Page 4
Unfold the loom;
Unscrew machine screws that keep the loom
folded.
Open the Ioom (front and back)
Fix and tighten both side hooks in place.
Install the Warp and Cloth Beam Cranks;
Remove the machine screws holding the
Beams in place and screw the Cranks into the
same holes.( Retain the machine screws for
FoIding)
Lay the loom on its back. Insert
heddles in the heddle supports.
Insert heddle supports in the shaft
frame.
Slide from the buttom of the loom
each shaft frame .
(Heddles support top and buttom
slide inside side loom grooves)
To make it nicer insert shaft frame so
the twist in the top part is always on
same side.
When all the 16 shaft frames
are installed and before you
move the loom, put the 2 soft
wood board (with black mark)
under the shafts so they will
not slide out of the castle
frame.