![Lechler 5TM Series Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/lechler/5tm-series/5tm-series_maintenance-instructions-manual_1866010049.webp)
4
9
All cylinder and hexagon head screws are coated with thread lock lacquer (considering for
drying time).
Screws on the covers, pos. 34, are tightened evenly and crosswise.
The specified torque values were observed.
Grub screw 5TC.000.1Y.24.S0.0 (pos. 24) is screwed in.
Functional test of the high impact tank cleaning machine: Rotation from 1.0 bar.
Checklist before commissioning after maintenance
After the maintenance has been carried out, the following points should be checked before
recommissioning: