LEADER EVAPORATOR WSE Evaporator
2018
Page:
9
SETUP OF THE WSE EVAPORATOR
NOTE: The following information pertaining to setup of an evaporator is to be considered one suggested method.
Installations should meet all applicable governmental regulations and standards.
The following documentation is pertinent to the setup of the WSE evaporator. Information about the
setup and use of other equipment can be found on the Leader Evaporator website –
under the Information Resources option.
SUGGESTED TOOLS:
7/16” box/open-end wrench
Phillips screwdriver
Utility knife
Plumb bob
Drill
Drill bits
Bricking trowel
Measuring tape
Marker (mark roof material)
Level 4’
Brick saw
RECEIVING YOUR EVAPORATOR:
Upon receipt of the evaporator, it is recommended the following tasks be performed:
1.
Protect all incoming materials from damage and the environment. If possible place the evaporator at the
location where it will be setup (See section titled SUGAR HOUSE SETUP).
2.
Unpack all materials and check the received materials against the Equipment Description list provided
above.
3.
Immediately notify Leader Evaporator or your local dealer if there are questions on the received equipment.