Installation steps
1.
Bottom cover assembly
2. Frame installation
Flyball installation steps
6 through joints
connect to be
bottom half ball
As shown in the figure,
the battery panel and
A-B block are assembled
by fixing with M2*9
screws, and affixed with
four single-sided buffer
glue
(130GT
leftover
pieces).
Содержание FLYBALL 230
Страница 5: ...Cut off the 3P plug and solder it to the programming lamp Marking of welding points ...
Страница 13: ...RECEIVER CONNECT 1 S BUS and PPM receiver ...
Страница 14: ...2 iBUS receiver 3 DSM2 and DSMX receiver ...
Страница 15: ...BETAFLIGHT Please go to the Google App Store to download and install the BETAFLIGHT Assistant Software ...