3
lci1.com
574-537-8900
Rev: 03.09.18
Solera
®
Destination Awning
Installation and Owner’s Manual
(For Aftermarket Application)
CCD-0001255
Installation
NOTE:
All fasteners supporting the awning assembly
MUST
have a backer within the structure of the wall of the unit.
Refer to unit manufacturer for proper location.
Installing the Awning Rail (If Necessary)
NOTE:
Awning rail not included.
1�
Position the awning rail along the line where roof and wall meet.
NOTE:
The awning rail
MUST
be level and parallel with the floor line of the unit
(Fig.2)
.
2�
After determining the awning rail’s proper location, mark its position with a non-permanent method of marking.
3�
Seal the back of the awning rail.
4�
Align the awning rail on the wall and secure with #10 x
3/4
"
screws, using all fastener holes.
Assembling the Awning
NOTE:
The head assemblies
(Fig.3A)
and support arm assemblies
(Fig.3B)
are numbered to ensure proper assembly.
Match the proper support arm assembly to the correct head assembly.
Floor Line
Awning Width = Head Bolt to Head Bolt
Side View
Front Facing View
A
B
E
D
B
90°
Fig.2
Letter Description
A
Awning Rail
B
Support Arm Assembly
C
Roll Tube Assembly
D
Lower Mounting Bracket
E
Upper Mounting Bracket
C
Dotted line
= vertical
centerline
Dotted line
= Vertical
centerline
D