G2F-POR101 Filter Cart Operation Procedure Manual
Part # NPOR101-2016
ISO 9001:2008 REGISTERED QMS
Page 9 of 16
Rev # 4.4
Jan. 2016
Copyright © 2016
PROCEDURES
After following all Safety procedures you may proceed to operate the G2F-
POR101 by following these instructions:
Ensure the power switch in the “off” position.
Ensure your licensed electrician has wired the G2F - POR101 in
accordance to the Standards of the Local Electrical Code for your area.
Take the end of the Inlet hose that has the female -6JIC swivel end and
attach it to the Inlet fitting of the Filter Cart. Take the other end of the
Inlet hose and insert the hose three quarters of the way down to one side
of the oil reservoir. This will ensure proper fluid suction. The Inlet hose
should not
be longer than 4 meters.
Take the end of the Outlet hose that has the female -6JIC swivel end and
attach it to the Outlet fitting of the Filter Cart. Take the other end of the
hose and insert it about ¼ of the way down in the oil reservoir and as far
opposite to the Inlet hose as possible.
By placing the hoses in this manner it will ensure optimal circulation and
maximum amount of oil being filtered within the reservoir.
Make sure inlet and outlet shut off valves are in the open position by:
Opening the inlet shut off valve.
Opening the outlet shut off valve.
NOTE:
First Picture below illustrates valve is the CLOSED POSITION
This picture indicates the OPEN POSITION