7. ASSEMBLY SEQUENCE
according to DIN EN 1004
Observe the general instructions for assembly and use on pages 4 – 5.
The snap-on claws of all parts must be snapped into the ladder frames
from above. Level the tower after the safety assembly.
The castors must be locked during assembly, modification or dis-
mantling and while there is anybody on the tower.
Hammer home the wedges in the system until the blow
bounces off. Screw couplers must always be well tightened
(50 Nm).
At the top tower level, a double guardrail
17
or a tower beam
18
can
be fitted instead of two single guardrails.
1.
Pull the basic tower
9
open and firmly snap in the joints in the
folding part.
2.
Snap the deck
23
or access deck
24
into the cross-rungs of the
basic tower. To do so, only the
1st, 2nd or 3rd rung from below
may
be used.
3.
Insert castors
1
into the ladder frames of the basic tower
9
and use
bolts and nuts to prevent them falling out.
Assembly
Tower model 620
1.
Pull the basic tower
9
open and firmly snap in the joints in the
folding part.
2.
Snap the access deck
24
into the top cross-rung of the basic tower.
3.
Insert castors
1
into the ladder frames of the basic tower
9
and use
bolts and nuts to prevent them falling out.
4.
Fit two 1.00 m ladder frames
10
onto the basic tower
9
and brace
them with two guardrails. Secure the ladder frame joints with spring
clips
15
.
Assembly
Tower model 621
Содержание ZIFA
Страница 15: ...15...
Страница 31: ...31 14 ZERTIFIKAT...
Страница 47: ...15...
Страница 63: ...31 14 CERTIFICATE...
Страница 79: ...15...
Страница 95: ...31 14 CERTIFICADO...