Part No. 87-230
Page 2
Installation Instructions
27810 Avenue Hopkins, Valencia, CA 91355 • www.lavi.com • 800.624.6225
Queue Guard
™
Germ Shields
1
3
STEP
Slide
Panel Spacers
into the grooves of posts
where
Queue Guard Panels
will be installed.
Spacers are placed into opposing post grooves
to control the height of the panels.
Insert Panel Spacers
STEP
1
4
STEP
For safety, please use 2 people for this step.
Confirm panel is right side up by verifying “Arrow Label”
position on panel (remove label after installation).
Lift
Queue Guard Panel
so the dovetail edges which
start halfway up the frame side, align with groove
openings at the top of 2 opposing
Tall Posts.
Carefully slide panel down post until it rests on the
Panel Spacers.
TIP:
Slide both sides of panel down in tandem, keeping
the panel parallel to floor. This will allow panel to slide
more smoothly.
Install Queue Guard
™
Panels
SPACERS
FACE INWARD
POST POSITION
SIDES OF FRAME
INTO GROOVES
SPACERS
FACE INWARD
THIS
SIDE UP
THIS
SIDE UP
Only
use a Microfiber cloth and Windex or other window
cleaning agents.
DO NOT
use paper towels of any kind, as
they scratch the plastic and over time will make it cloudy.
Cleaning Panels