background image

Part No. 87-230

Page 2

Installation Instructions

27810 Avenue Hopkins, Valencia, CA 91355   •   www.lavi.com   •   800.624.6225

Queue Guard

 Germ Shields

1

3

STEP

Slide 

Panel Spacers

 into the grooves of posts 

where 

Queue Guard Panels

 will be installed. 

Spacers are placed into opposing post grooves 
to control the height of the panels.

Insert Panel Spacers

STEP

1

4

STEP

For safety, please use 2 people for this step. 

Confirm panel is right side up by verifying “Arrow Label” 
position on panel (remove label after installation).

Lift 

Queue Guard Panel 

so the dovetail edges which 

start halfway up the frame side, align with groove 
openings at the top of 2 opposing 

Tall Posts. 

Carefully slide panel down post until it rests on the

 

Panel Spacers. 

TIP:

 Slide both sides of panel down in tandem, keeping 

the panel parallel to floor. This will allow panel to slide 
more smoothly.

Install Queue Guard

 Panels

SPACERS

FACE INWARD

POST POSITION

SIDES OF FRAME

INTO GROOVES

SPACERS

FACE INWARD

THIS 

SIDE UP

THIS 

SIDE UP

Only

 use a Microfiber cloth and Windex or other window 

cleaning agents. 

DO NOT

 use paper towels of any kind, as 

they scratch the plastic and over time will make it cloudy.

Cleaning Panels

Отзывы: