background image

LAUNCH                                                VALUE-100 A/C Service Station User’s Manual 

 

  

 

ATTENTIN: 

Should  the  pressure  in  the  bottle  be  insufficient  to 

charge  the  A/C  system,  it  will  be  necessary  to  force  the  system  to 
take  up  the  fluid  by  suction.  With  the  quick-connect  couplings 
attached, CLOSE the high-pressure tap and run the A/C system with 
the  low-pressure  tap  open.  In  the  case  of  a  single  high-pressure 
coupling, charge about 100g in excess of the required quantity, since 
this  amount  will  remain  in  the  high-pressure  hose  at  the  end  of  the 
operation.   

RUTINE MAINTENANCE 

FILLING THE 

MACHINE

 TTLE 

This  operation  must  be  performed  whenever  the  available 

refrigerant  in  the  bottle  is  less  than  3  kg  and  must  in  any  case  be 
performed  when  the  “empty  bottle”  indicator  lights  on  the  control 
console. 

IMPRTANT: 

Never tamper with the taps on the machine bottle. 

Procure a bottle of R134a gas; connect it to the high-pressure hose 
of  the  MACHINE.  Open  the  tap  of  the  external  bottle  and  the 
high-pressure  tap  of  the  MACHINE.  If  the  external  bottle  is  not 
supplied with a suction device, turn it upside down to obtain a higher 
delivery  rate.  Switch  the  machine  on,  then  hold  down  the  SEL  key 
until  the  LED  corresponding  to “Recovery”  lights.  Press the  START 
key  to  start  the  MACHINE.  The  display  will  indicate  the  quantity  of 
refrigerant transferred to the bottle on board the machine. Close the 
tap of the external bottle when the quantity transferred is 0.50 kg less 
than the final quantity desired. Allow the machine to recover the fluid 
remaining  in  the  hose.  The  “oil  discharge”  LED  will  light  when  the 
machine will have recovered all the fluid from the hose. The machine 
will stop automatically. Close the high-pressure tap on the MACHINE, 
press the STOP key, and disconnect the external bottle. 

VACUUM PUMP   

Perform the operations listed below on a routine basis in order to 

ensure good operation of the vacuum pump: 

M1) Oil top-up. 
M2) Oil change. 
When  topping-up  or  replacing  the  pump  oil,  use  only  the  oil 

recommended  by  the  manufacturer.  Contact  your  retailer  for 
information concerning the correct type of oil. 

Содержание VALUE-100

Страница 1: ...A C Service Station VALUE 100 LAUNCH USER SMANUAL Launch Machinery Co Ltd...

Страница 2: ...LAUNCH VALUE 100 A C Service Station User s Manual i 1 1 1 2 3 3 4 5 5 6 6 6 6 7 8 8 9 9 10 11 12 12 13 M 1 13 M 2 14 14 15 16 16 16 17 KG L S R L S KG 17 17 18...

Страница 3: ...LAUNCH VALUE 100 A C Service Station User s Manual 1 392 89 1...

Страница 4: ...LAUNCH VALUE 100 A C Service Station User s Manual 2 1 1060 500 520 80 70dB A...

Страница 5: ...LAUNCH VALUE 100 A C Service Station User s Manual 3 2002 96 EC WEEE WEEE R134a A C OFF A C A C A C A C...

Страница 6: ...LAUNCH VALUE 100 A C Service Station User s Manual 4 80 A C A C R134a R134a R134a...

Страница 7: ...LAUNCH VALUE 100 A C Service Station User s Manual 5 R134a GWP 1300 A C A C 2 3 2 1 1 2 4 10 2 1 4 1 1 6 1 2 1...

Страница 8: ...LAUNCH VALUE 100 A C Service Station User s Manual 6 1 4 5 6 7 a b c d e f g h i j k l m n COM o p q 8 A1 A C A2 A C A3 A4 A6 A7 A8 A9 9 T1 LED T2 LED T3 LED T4 LED T5 LED T6 SEL...

Страница 9: ...LAUNCH VALUE 100 A C Service Station User s Manual 7 T1 T4 LED T7 T8 T9 ENTER LED ENTER T10 START LED T11 STOP LED T12 TEMPERATURE F T13 10 C1 5 5 8 5 C2 17 5 C3 80 10kg C4 2kg...

Страница 10: ...5 5 6 23 5 7 23 5 5 8 24 5 9 24 5 6 25 6 1 25 5 6 2 26 6 3 26 5 6 4 27 6 5 27 5 6 6 28 6 7 28 5 6 8 29 6 9 29 5 7 1 30 7 2 30 5 7 3 31 7 4 31 5 7 5 32 7 6 32 5 7 7 33 7 8 33 5 8 34 8 1 34 5 8 2 35 8...

Страница 11: ...LAUNCH VALUE 100 A C Service Station User s Manual 9 1 A C A C 2 10 3 4 5 SEL LED START LED A C 4 A C 6 OFF 7 A C 1...

Страница 12: ...LAUNCH VALUE 100 A C Service Station User s Manual 10 SEL Vacuum START 25 A C SEL Vacuum ENTER ENTER 2 0000 3 A1 A2 2 A C 1 A C e 20 2 3 4...

Страница 13: ...LAUNCH VALUE 100 A C Service Station User s Manual 11 A C 1 SEL Charging 2 a ENTER ENTER b ENTER 3 START 8 45 A C...

Страница 14: ...LAUNCH VALUE 100 A C Service Station User s Manual 12 4 5 6 A C 3 7 A C 8 1 A C A C A C 3 R134a...

Страница 15: ...LAUNCH VALUE 100 A C Service Station User s Manual 13 SEL START 0 50 STOP M1 M2 1 4 11 1 1 2 2 1 2 4 2...

Страница 16: ...LAUNCH VALUE 100 A C Service Station User s Manual 14 2 150 300 280 1 2 2 11 3 3 4 10 5 3 6 4 7 2 SERV 12 1 2 3 4 5 1 12 4 12 6 2 12 4 12...

Страница 17: ...LAUNCH VALUE 100 A C Service Station User s Manual 15 7 8 9 3 12 5 12 STOP RESET 10 11 2 12 4 12 12 13 1 12 4 12 3 12 5 12 14 15 16 17 10 SERV SEL 18 19 500g 20 21 100...

Страница 18: ...LAUNCH VALUE 100 A C Service Station User s Manual 16 200 3 16 18 3 i 7 5 40 10 5 ENTER...

Страница 19: ...LAUNCH VALUE 100 A C Service Station User s Manual 17 16 18 SEL ENTER 6 1 0 5 1 2 3 kg lbs lbs kg SEL START ENTER...

Страница 20: ...LAUNCH VALUE 100 A C Service Station User s Manual 18...

Страница 21: ...PANEL 8 PRELIMINARY OPERATIONS 9 PURGE NON CONDENSABLE GAS 9 RECOVERY RECYCLING PHASE 10 VACUUM PHASE 10 NEW OIL REINTEGRATION 11 CHARGING REINTEGRATION PHASE 11 ROUTINE MAINTENANCE 13 FILLING THE MAC...

Страница 22: ...free of charge replacement or repair of defective component parts or parts considered defective by the Manufacturer Reference to the machine serial number must be included in any requests for spare p...

Страница 23: ...cking must always be used The manufacturer declines any and all responsibility for damage to vehicles on which recovery recycling and recharging are performed if said damage is the result of unskillfu...

Страница 24: ...Wear protective gloves and goggles Do not expose the machine to direct sunlight or rain Use only in well ventilated work areas Before performing any operation check the vehicle use and maintenance ma...

Страница 25: ...ental conditions In order that they may be shipped and used they must be compressed into suitable bottles We therefore recommend observing all the general precautions applicable to handling of pressur...

Страница 26: ...certain operational and seal tests on the A C system SETUP The machine is supplied fully assembled and tested Referring to Figure 2 mount the hose with the BLUE quick connect coupling on the male thr...

Страница 27: ...AND C NTR L SYSTEM Refer to fig 8 A1 High pressure gauge for A C system A2 Low pressure gauge for A C system A3 Printer optional A4 Pressure gauge for bottle refrigerant pressure A6 Emergency alarms p...

Страница 28: ...ng this key will start the operation indicated by the lighted LED T11 STOP key Pressing this key will stop the operation indicated by the flashing LED T12 TEMPERATURE key Pressing this key the display...

Страница 29: ...le press the temperature bottle key ref T12 fig 9 and read the temperature of the bottle Compare the bottle pressure with the one into the table if the bottle pressure if higher of the pressure read o...

Страница 30: ...h During this phase the amount of refrigerant recovered from the system will be displayed in kilograms Upon completion of the recovery phase the machine will stop and automatically discharge the used...

Страница 31: ...N 1 Measure the quantity of oil extracted from the A C system and check that the new oil container e contains at least 20 cc more than this quantity 2 Open the high and low pressure taps or in the ca...

Страница 32: ...l reappear Please contact your retailer if you wish to install the database 3 Open the high and low pressure taps if previously closed and press the START key ATTENTION if the pressure in the bottle i...

Страница 33: ...rnal bottle and the high pressure tap of the MACHINE If the external bottle is not supplied with a suction device turn it upside down to obtain a higher delivery rate Switch the machine on then hold d...

Страница 34: ...efrigerant filters are replaced The oil must also be replaced whenever it changes color due to absorption of humidity Before beginning the oil change procedure procure a container of at least 300 cc c...

Страница 35: ...Reset 10 Disconnect the machine from the power supply 11 Disconnect the L P quick coupler from the fitting 2 fig 12 of the filter 4 fig 12 12 Replace the old filters with the new ones paying attention...

Страница 36: ...ould be performed when the scale values displayed are out of line with known values The operations listed below must be performed with the maximum attention and care Always observe the precautions out...

Страница 37: ...e Switch on the MACHINE taking care not to touch any electrical wires Check calibration place a known 0 5 kg or 1 kg reference weight on the bottle and check that the displayed availability value incr...

Страница 38: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 39: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 40: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 41: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 42: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 43: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 44: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 45: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 46: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 47: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Страница 48: ...________________________________________________________ ___________________________________________________________ ___________________________________________________________ _______________________...

Страница 49: ...LAUNCH Conditions of granting of a guarantee on the Equipment LAUNCH ________________________________________ 1 12 2 3 4 IMEI 1 2...

Страница 50: ...A C Service Station VALUE 100 LAUNCH Launch Machinery Co Ltd...

Отзывы: