![Lattner Boiler Company WLF 9.5 HP Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/lattner-boiler-company/wlf-9-5-hp/wlf-9-5-hp_instruction-manual_3834736002.webp)
WARRANTY VALIDATION & BOILER START UP REPORT
Lattner Boiler Model:
National Board Number (“NB”):
Lattner Dealer Name:
Start Up Company:
Start Up Date:
Start Up Technician:
Owner Name:
Company Name:
Street Address (start up location):
State:
Zip Code:
Telephone Number:
Natural Gas or
LP (Propane) Gas
Voltage:
v /
ph /
hz
Gas Pressure at Train Inlet:
” w.c. (boiler OFF)
Pilot Signal Reading:
VDC
Gas Pressure at Train Inlet:
” w.c. (boiler ON)
O
2
:
%
Manifold Pressure:
” w.c. (boiler OFF)
CO
2
:
%
Manifold Pressure:
” w.c. (boiler ON)
CO:
parts per million (ppm)
Gas Pressure at Pilot Tee:
” w.c. (boiler OFF)
NO
x
:
parts per million (ppm)
Gas Pressure at Pilot Tee:
” w.c. (boiler ON)
Stack Temperature:
degrees Fahrenheit
Input:
btu/hr (cu. ft clocked at meter)
Combustion Efficiency:
%
Limit Control Setting (cut out):
psi or
°
F
Modulating Control Setting:
psi or
°
F
Operating Control Setting:
psi or
°
F
Modulating Control Differential Setting:
psi or
°
F
Operating Control Differential Setting:
psi or
°
F
Checked for proper operation of:
Low Water Cut Off
yes
no
Barometric Damper
yes
no
High Water Cut Off
yes
no
Boiler Combustion Air
yes
no
Flame Safeguard Control Ignition
yes
no
Boiler Flue/Stack Compliance
yes
no
Flame Safeguard Main Flame
yes
no
Gas Line Leakage
yes
no
Air Flow Switch
yes
no
Gas Equipment Ventilation
yes
no
Notes:
IMPORTANT:
For warranty validation, return this document to (mail, fax, or email):
Lattner Boiler Manufacturing Company
P.O. Box 1527
Cedar Rapids, IA 52406
T: (319) 366-0778
F: (319) 366-0770
The following information must be recorded during each boiler start up. This information must
be returned to Lattner Boiler Manufacturing Company for warranty validation.
If this information is not returned, warranty consideration may not be extended.