![Lattner Boiler Company Alkon 90 Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/lattner-boiler-company/alkon-90/alkon-90_installation-and-servicing-manual_679636031.webp)
31
Instructions for the installer
3.20 -
FUNCTIONAL FLOW WIRING DIAGRAM
CSD - 1
Prearrangement for the
connection of the
additional safety devices
2
ORA
N
GE
+
BL
AC
K (
-)
BR
O
W
N (
P
W
M
)
BL
U
E
(
T
A
C
HO
)
4
5
BL
UE
(
N
)
1
2
BR
O
W
N (
L
1
)
3
RI
L
./R
E
G
.
AL
IM
.
230V
SRR SR
TL
BROWN
BROWN
BLUE
BLU
E
YELL/
GR
EE
N
L1
N
120
V
-
6
0
Hz
BR
O
W
N
LI
G
H
TB
LU
E
BR
O
W
N
LI
G
H
TB
L
U
E
BLUE - N
BROWN - L
E.
A
C
C
TR
. A
C
C
YELL
/G
REE
N
BRO
WN
BLUE
BL
UE
BR
O
W
N
E. RIV.
BROW
N
WHIT
E
DK
TF
BL
AC
K
TA
E8
PF
RED
YEL/GREEN
BLUE
IG
VM
VG
YEL
/G
RE
EN
(c )
(no
)
BLUE
CDS
-1
P
BL
U
E
1 (NC)
SL
BL
U
E
PF
BR
O
W
N
3 ( C
)
WH
IT
E
TS
C
= Minimum water pressure switch
= Ignition electrode
= Detection electrode
= Power switch On-Off
= Motor 3 way valve (optional)
= Pump
= Smoke Pressostat
= CH sensor
= CH return sensor
= DHW sensor (optional)
= Limit thermostat
= Smoke thermostat (only pre-arrangement)
= High limit thermostat exchanger
= Ignition transformer
= Gas valve
= Modulating fan detection/adjustment
DK
E. ACC
E. RIV.
IG
MDV
P
PF
SR
SRR
SS
TL
TF
TSC
TR.ACC
VG
VM
Содержание Alkon 90
Страница 34: ...34 Instructions for the installer ...
Страница 49: ...49 Spare parts ...
Страница 50: ......
Страница 51: ......