15
Instructions for the installer
-
Remove the packaging materials.
-
Do not tear the packaging.
-
Take note of the necessary space around the boiler for
installation of venting system, pipework and servicing. See
drawing in section 3.4
The location of the boiler can be determined by using the
draw on page 16. Remember to account for the spacing of the
plumbing kit.
-
Drill the necessary holes
-
Install the mounting bracket to the wall using the supplied
mounting materials
CAUTION
Lifting and carrying precautions.
To avoid personal injury please follow these
recommendations:
- Always move the boiler with 2 people or
use special equipment.
- When move the boiler, bend the knees, and
keep the back straight and feet apart.
- Do not lift and twist at the same time.
- Lift and carry the boiler close to the body.
- Wear protective clothing and gloves to pro-
tect from any sharp edges.
- Dispose the packaging materials.
Before positioning the boiler, screw down the
adjustable feet supplied with the boiler.
The casing front panel is hinged on the R.H.
side. The hinges ‘’A’’ are factory fitted on the
R.H. side of the frame. For the introduction of
the cocker remove the precut disk ‘’B’’ with
a screwdriver and fit the cocker as shown in
the figure.
In case the casing front panel needs to be hinged on the
L.H. side, deplace the hinges ‘’A’’ from R.H. to L.H. side; then
remove the precut disk ‘’C’’ from the front panel and fit the
locker as shown in the figure.
A
B
EXTERNAL
SIDE OF THE
CASING
B
C
Mounting of the locker
Mounting of the adjustable feet
INTERNAL
SIDE OF THE
CASING
A
Содержание Alkon 90
Страница 34: ...34 Instructions for the installer ...
Страница 49: ...49 Spare parts ...
Страница 50: ......
Страница 51: ......